TEXAS · WELLS · PALO PINTO COUNTY · API 42-363-34609 · DISTRICT 6E

Long Ranch #20

Y

Palo Pinto County · Burleson (Strawn) field · Producing  · Vertical

Long Ranch #20 (API 42-363-34609) is a well in Palo Pinto County operated by Stephens & Johnson Operating CO., completed March 21, 2000 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1996 and 2000, permitted to 3,679 ft.

Completion filings report 6 formation tops, including Burleson Strawn, Bs Congl. Zone 3, Bs Congl. Zone 4, Bs Congl. Zone 5.

No lease production has been reported under this well’s leases.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.Apr 26, 2000
3,679
total depth, ft
2
permits on file
Apr 26, 2000
last permit issued
Mar 21, 2000
completed
0
cumulative oil, bbl
525K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long Ranch G-8-177069Burleson (Strawn)Stephens & Johnson Operating Co.10370KMar 2000 – Jul 2026
Long Ranch G-8-161445Strawn, NW. (Marble Falls)Stephens & Johnson Operating Co.10155KJan 1997 – Dec 2005
Long Ranch G-8-161482Strawn, NW. (Marble Falls)Stephens & Johnson Operating Co.100Jan 1997 – Jan 1997

Gas, mcf lease total

Last 12 months 5,016 · prior 12 5,310(-6%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Jan 1997 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494180-99RecompletionStephens & Johnson Operating Co.Apr 17, 2000Apr 26, 2000Mar 20, 20002,000
456213-99DrillStephens & Johnson Operating Co.Dec 12, 1996Dec 16, 1996Jan 6, 19974,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 2000Long Ranch G-8-177069Burleson (Strawn)Stephens & Johnson Operating Co.Producing3,679
Jan 18, 1997Long Ranch G-8-161445Strawn NW. (Marble Falls)Stephens & Johnson Operating Co.Not on Schedule—
—Long Ranch G-8-161482Strawn NW. (Marble Falls)Stephens & Johnson Operating Co.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,019 ft elevation.Download CSV →

FormationMD ftSubsea
Burleson Strawn1,700-681
BS Congl. Zone 33,249-2,230
BS Congl. Zone 43,323-2,304
BS Congl. Zone 53,423-2,404
BS Congl. Zone 63,501-2,482
DufferDUFFER LIME3,653-2,634
DufferDUFFER LM3,653-2,634

Perforations

Perforated and open-hole intervals.

FromToType
1,8461,852Perforated
1,8741,880Perforated
3,4973,504Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525912.25165 S
4.53,6787.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 21, 2000May 10, 2000Yes
00Jun 5, 2000——
00Mar 4, 1997Feb 7, 1997Yes
00Feb 28, 1997Feb 7, 1997—
00Feb 11, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334609, documented in the API reference.