TEXAS · WELLS · PALO PINTO COUNTY · STALEY, J. C. LEASE · API 42-363-34657 · DISTRICT 6E

Staley J. C. #1

Y

Palo Pinto County · Palo Pinto Co. Reg. (Gas) field · Producing  · Vertical

Staley J. C. #1 (API 42-363-34657) is a well in Palo Pinto County operated by Texxol Operating Company Inc., completed September 3, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 16, 1997, permitted to 4,305 ft.

It was permitted by Richey, Ray Management CO., Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Strawn, Pregnant Shale.

Its lease has reported 6 barrels of oil and 200K mcf of gas since September 1997, last reporting volume in April 2026.

Operator of record

Texxol Operating Company Inc.

Permitted by Richey, Ray Management Co., Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
May 19, 2026
Permits on file
20
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexxol Operating Company Inc.
Production reportsTexxol Operating Company, Inc.through Apr 2026
Latest permitRichey, Ray Management Co., Inc.May 16, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,305
total depth, ft
1
permits on file
May 16, 1997
last permit issued
Sep 3, 1997
completed
6
cumulative oil, bbl
200K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 3, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Staley, J. C. G-8-164772Palo Pinto Co. Reg. (Gas)Texxol Operating Company, Inc.16200KSep 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 3,111 · prior 12 3,918(-21%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Richey, Ray Management Co., Inc.Sep 1997 → Jul 2013
  2. 2Texxol Operating Company, Inc.Aug 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
462261-99DrillRichey, Ray Management Co., Inc.May 12, 1997May 16, 1997Jun 13, 19974,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 3, 1997Staley J. C. G-8-164772Palo Pinto Co. Reg. (Gas)Texxol Operating Company Inc.Producing4,305

Formation tops

As filed on W-2/G-1. Subsea from 1,201 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN SD.2,018-817
Pregnant Shale3,196-1,995

Perforations

Perforated and open-hole intervals.

FromToType
2,1282,143Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62528912.25195 S
4.54,2767.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 12, 1997Oct 1, 1997Yes
00Oct 14, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334657, documented in the API reference.