TEXAS · WELLS · PALO PINTO COUNTY · BALL "ASHWORTH" LEASE · API 42-363-34685 · DISTRICT 6E
Ball Ashworth #2
Palo Pinto County · Strawn East (Marble Falls) field · Vertical
Ball Ashworth #2 (API 42-363-34685) is a plugged well in Palo Pinto County, plugged July 3, 2023, last operated by Tandem Energy Corporation.
The RRC has issued one drilling permit, issued August 13, 1997, permitted to 2,999 ft.
Completion filings report one formation top, including Marble Falls.
Its lease has reported 286K mcf of gas since October 1997, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 24, 2026
- Permits on file
- 138
- Phone
- (713) 364-7822
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tandem Energy Corporation |
| Production reports | Tandem Energy Corporationthrough Sep 2015 |
| Latest permit | Tandem Energy CorporationAug 13, 1997 |
- 2,999
- total depth, ft
- 1
- permits on file
- Aug 13, 1997
- last permit issued
- Oct 31, 1997
- completed
- 0
- cumulative oil, bbl
- 286K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 31, 1997
- Shut in
- —
- Plugged
- Jul 3, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ball "Ashworth" G-8-165539 | Strawn, East (Marble Falls) | Tandem Energy Corporation | 1 | 0 | 286K | Oct 1997 – Sep 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tandem Energy CorporationNov 1997 → Sep 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 466018-99 | Drill | Tandem Energy Corporation | Aug 8, 1997 | Aug 13, 1997 | Sep 9, 1997 | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 31, 1997 | Ball Ashworth G-8-165539 | Strawn East (Marble Falls) | Tandem Energy Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 962 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 2,957 | -1,995 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,956 | 2,996 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 151 | 12.25 | 80 S |
| 4.5 | 2,956 | 7.875 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 1998 | Dec 9, 1997 | Yes |
| 00 | Dec 15, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-34685 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-34685 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36334685, documented in the API reference.