WELL · 42-363-34710 · DISTRICT 7

Watson Ruby #1

Plugged

Palo Pinto County · Palo Pinto County Regular field  · Vertical

Watson Ruby #1 (API 42-363-34710) is a plugged well in Palo Pinto County, plugged October 30, 1998, last operated by Pitcock Inc..

The RRC has issued one drilling permit, issued October 15, 1997, permitted to 5,000 ft.

Completion filings report 3 formation tops, including Palo Pinto, Strawn, Conglomerate.

Its lease has reported 176 barrels of oil and 233 mcf of gas since May 1998, last reporting in November 1998.

Operator of record

Pitcock Inc.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Jul 21, 2025
Permits on file
265
Phone
(940) 549-3344

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePitcock Inc.
Production reportsPitcock, Inc.through Jul 1998
Latest permitPitcock, Inc.Oct 15, 1997
5,000
total depth, ft
1
permits on file
Oct 15, 1997
last permit issued
May 22, 1998
completed
176
cumulative oil, bbl
233
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Nov 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 22, 1998
Shut in
—
Plugged
Oct 30, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Watson, Ruby O-8-28468Palo Pinto County RegularPitcock, Inc.1176233May 1998 – Nov 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pitcock, Inc.May 1998 → Jul 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
468453-99DrillPitcock, Inc.Oct 6, 1997Oct 15, 1997Apr 9, 19985,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28468————

Formation tops

As filed on W-2/G-1. Subsea from 1,280 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto400880
Strawn2,735-1,455
Conglomerate3,716-2,436

Perforations

Perforated and open-hole intervals.

FromToType
4,1324,137Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521412.25200 S
4.54,2407.875191 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 1998Jun 1, 1998Yes
00Jun 11, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334710, documented in the API reference.