TEXAS · WELLS · PALO PINTO COUNTY · STUART, ELLEN G. "B" LEASE · API 42-363-34837 · DISTRICT 6E

Stuart Ellen G. B #9

Y

Palo Pinto County · Mallory (Strawn) field · Producing  · Vertical

Fields on the latest permit · any of 3
Mallory (Strawn) · Palo Pinto County Regular · Palo Pinto Co. Reg. (Gas)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Stuart Ellen G. B #9 (API 42-363-34837) is a well in Palo Pinto County operated by Stephens & Johnson Operating CO., completed October 3, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 28, 1999, permitted to 1,870 ft.

Completion filings report one formation top, including Strawn.

Its lease has reported 93.6K barrels of oil and 278K mcf of gas since October 1999, last reporting volume in April 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.Jun 28, 1999
1,870
total depth, ft
2
permits on file
Jun 28, 1999
last permit issued
Oct 3, 1999
completed
93.6K
cumulative oil, bbl
278K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 3, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stuart, Ellen G. "B" O-8-28674Mallory (Strawn)Stephens & Johnson Operating Co.1093.6K278KOct 1999 – Apr 2026

Oil, barrels lease total

Last 12 months 1,200 · prior 12 807(+49%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Oct 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485520-98DrillStephens & Johnson Operating Co.Oct 18, 1999Jun 28, 1999Sep 6, 19992,000
485520-99DrillStephens & Johnson Operating Co.Jun 28, 1999Jun 28, 1999—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 3, 1999Stuart Ellen G. B O-8-28674Mallory (Strawn)Stephens & Johnson Operating Co.Producing1,870

Formation tops

As filed on W-2/G-1. Subsea from 1,373 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn1,465-92

Perforations

Perforated and open-hole intervals.

FromToType
1,5931,597Perforated
1,6071,610Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535011230 S
5.51,8707.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 22, 1999Oct 14, 1999Yes
00Nov 4, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334837, documented in the API reference.