TEXAS · WELLS · PALO PINTO COUNTY · M0RROW, ERWIN LEASE · API 42-363-34956 · DISTRICT 6E

M0RROW Erwin #1

Shut in

Palo Pinto County · Palo Pinto Co. Reg. (Gas) field · Producing  · Vertical

M0rrow Erwin #1 (API 42-363-34956) is a well in Palo Pinto County operated by Texxol Operating Company Inc., completed October 12, 2000 and listed as producing on the RRC schedule, shut in June 1, 2024.

The RRC has issued one drilling permit, issued August 29, 2000, permitted to 4,595 ft.

It was permitted by Richey, Ray Management CO., Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its lease has reported 32 barrels of oil and 301K mcf of gas since October 2000, last reporting volume in May 2024.

Operator of record

Texxol Operating Company Inc.

Permitted by Richey, Ray Management Co., Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
May 19, 2026
Permits on file
20
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexxol Operating Company Inc.
Production reportsTexxol Operating Company, Inc.through May 2024
Latest permitRichey, Ray Management Co., Inc.Aug 29, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,595
total depth, ft
1
permits on file
Aug 29, 2000
last permit issued
Oct 12, 2000
completed
32
cumulative oil, bbl
301K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH May 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 12, 2000
Shut in
Jun 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
M0RROW, Erwin G-8-179670Palo Pinto Co. Reg. (Gas)Texxol Operating Company, Inc.132301KOct 2000 – May 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 351(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Richey, Ray Management Co., Inc.Oct 2000 → Jul 2013
  2. 2Texxol Operating Company, Inc.Aug 2013 → May 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498876-99DrillRichey, Ray Management Co., Inc.Aug 25, 2000Aug 29, 2000Sep 6, 20004,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 12, 2000M0RROW Erwin G-8-179670Palo Pinto Co. Reg. (Gas)Texxol Operating Company Inc.Producing · shut in Jun 1, 20244,595

Formation tops

As filed on W-2/G-1. Subsea from 980 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN SAND3,034-2,054

Perforations

Perforated and open-hole intervals.

FromToType
3,0783,145Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62576512.25200 S
—3,049—100 S
4.54,3107.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 17, 2001Nov 3, 2000Yes
00Nov 29, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36334956, documented in the API reference.