TEXAS · WELLS · PALO PINTO COUNTY · STUART, E. G. "C" LEASE · API 42-363-35030 · DISTRICT 6E

Stuart E. G. C #18

Plugged

Palo Pinto County · Mallory (Strawn) field  · Vertical

Stuart E. G. C #18 (API 42-363-35030) is a plugged well in Palo Pinto County, plugged July 20, 2026, last operated by Stephens & Johnson Operating CO..

The RRC has issued one drilling permit, issued June 18, 2001, permitted to 2,000 ft.

Completion filings report one formation top, including 1450 Strawn.

Its lease has reported 229K barrels of oil and 604K mcf of gas since September 1999, last reporting volume in April 2026. The lease carries 25 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.Jun 18, 2001
2,000
total depth, ft
1
permits on file
Jun 18, 2001
last permit issued
Aug 27, 2001
completed
229K
cumulative oil, bbl
604K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 27, 2001
Shut in
—
Plugged
Jul 20, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stuart, E. G. "C" O-8-28660Mallory (Strawn)Stephens & Johnson Operating Co.25229K604KSep 1999 – Apr 2026

Oil, barrels lease total

Last 12 months 1,758 · prior 12 1,677(+5%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 263 · prior 12 0

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Sep 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510373-99DrillStephens & Johnson Operating Co.Jun 18, 2001Jun 18, 2001Aug 21, 20012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 27, 2001Stuart E. G. C O-8-28660Mallory (Strawn)Stephens & Johnson Operating Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,352 ft elevation.Download CSV →

FormationMD ftSubsea
1450 Strawn1,438-86

Perforations

Perforated and open-hole intervals.

FromToType
1,4981,612Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546912320 S
5.51,7937.875190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 16, 2001Sep 19, 2001Yes
00Oct 1, 2001——

Well logs

The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.

Open the RRC's log search for this well ↗

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36335030, documented in the API reference.