TEXAS · WELLS · PALO PINTO COUNTY · API 42-363-35142 · DISTRICT 6E

Sun Mineral Deed #5

Shut in

Palo Pinto County · Gilmore Creek (Big Saline ) field · Shut In  · Vertical

Sun Mineral Deed #5 (API 42-363-35142) is a well in Palo Pinto County operated by Stephens & Johnson Operating CO., completed March 7, 2003 and listed as shut in on the RRC schedule, shut in June 1, 2005.

The RRC has issued one drilling permit, issued February 3, 2003, permitted to 3,850 ft.

Completion filings report 9 formation tops, including Congl. No. 1, Congl. No.1, Congl. No. 3, Congl. No.3.

Its 2 leases have reported 543 barrels of oil and 3.02K mcf of gas since March 2003, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Aug 2004
Latest permitStephens & Johnson Operating Co.Feb 3, 2003
3,850
total depth, ft
1
permits on file
Feb 3, 2003
last permit issued
Mar 7, 2003
completed
543
cumulative oil, bbl
3.02K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 7, 2003
Shut in
Jun 1, 2005
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sun Mineral Deed O-8-29300Gilmore Creek (Big Saline )Stephens & Johnson Operating Co.154334Mar 2003 – Jul 2026
Sun Mineral Deed G-8-194336Gilmore Creek (Big Saline )Stephens & Johnson Operating Co.102.99KMar 2003 – Nov 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stephens & Johnson Operating Co.Mar 2003 → Aug 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527981-99DrillStephens & Johnson Operating Co.Feb 3, 2003Feb 3, 2003Feb 20, 20034,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 7, 2003Sun Mineral Deed O-8-29300Gilmore Creek (Big Saline )Stephens & Johnson Operating Co.Shut In · shut in Jun 1, 20053,850
Mar 7, 2003Sun Mineral Deed G-8-194336Gilmore Creek (Big Saline )Stephens & Johnson Operating Co.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,185 ft elevation.Download CSV →

FormationMD ftSubsea
Congl. No. 13,221-2,036
Congl. NO.13,221-2,036
Congl. No. 33,455-2,270
Congl. NO.33,455-2,270
Congl. No. 53,614-2,429
Congl. NO.53,614-2,429
Congl. No. 73,676-2,491
Congl. NO.73,676-2,491
Duffer3,780-2,595

Perforations

Perforated and open-hole intervals.

FromToType
3,6863,692Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525312.25160 S
4.53,8357.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 2003Aug 20, 2003—
00Oct 29, 2003——
00Jun 10, 2003Mar 17, 2003Yes
00May 19, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36335142, documented in the API reference.