WELL · 42-363-35184 · DISTRICT 7
Sandy #1
Palo Pinto County · Brazos Bishop (Strawn 2100) field · Producing · Vertical
Sandy #1 (API 42-363-35184) is a well in Palo Pinto County operated by Esg Resources LLC, completed October 15, 2003 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued September 10, 2003, permitted to 3,351 ft.
It was permitted by Engas Corporation and has since transferred to Esg Resources LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Engas Corporation; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 15, 2025
- Phone
- (780) 205-4529
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Esg Resources LLC |
| Production reports | Esg Resources LLCthrough Apr 2026 |
| Latest permit | Engas CorporationSep 10, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,351
- total depth, ft
- 2
- permits on file
- Sep 10, 2003
- last permit issued
- Oct 15, 2003
- completed
- 0
- cumulative oil, bbl
- 193K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 15, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sandy G-8-198412 | Brazos Bishop (Strawn 2100) | Esg Resources LLC | 1 | 0 | 193K | Oct 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,868 · prior 12 1,825(+2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Engas CorporationDec 2003 → Dec 2006
- 2Tempo Resources GP, LLCJan 2007 → Apr 2013
- 3Dallas Production, Inc.May 2013 → Feb 2021
- 4Dallas Production Company LLCMar 2021 → Sep 2023
- 5Esg Resources LLCOct 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 536297-98 | Drill | Engas Corporation | Dec 16, 2003 | Sep 10, 2003 | — | 4,000 |
| 536297-99 | Drill | Engas Corporation | Sep 10, 2003 | Sep 10, 2003 | Sep 23, 2003 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 15, 2003 | Sandy G-8-198412 | Brazos Bishop (Strawn 2100) | Esg Resources LLC | Producing | 3,351 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,162 | 2,172 | Perforated |
| 2,188 | 2,191 | Perforated |
| 2,208 | 2,216 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 10 | 15 | 5 S |
| 8.625 | 1,069 | 12.25 | 405 S |
| 5.5 | 3,343 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2004 | Dec 30, 2003 | Yes |
| 00 | Jan 14, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-35184 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-35184 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36335184, documented in the API reference.