WELL · 42-363-35305 · DISTRICT 8

Witt #1

Plugged

Palo Pinto County  · Vertical

Witt #1 (API 42-363-35305) is a plugged well in Palo Pinto County, plugged January 9, 2005, last operated by Pryor Petroleum Corporation.

The RRC has issued one drilling permit (amended once), issued September 30, 2004, permitted to 4,999 ft.

Operator of record

Pryor Petroleum Corporation

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 17, 2026
Permits on file
32
Phone
(940) 691-9676

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPryor Petroleum CorporationSep 30, 2004
4,999
total depth, ft
2
permits on file
Sep 30, 2004
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 9, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
551591-98DrillPryor Petroleum CorporationJan 6, 2005Sep 30, 2004Dec 22, 20044,999
551591-99DrillPryor Petroleum CorporationSep 27, 2004Sep 30, 2004—4,300

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36335305, documented in the API reference.