TEXAS · WELLS · PALO PINTO COUNTY · STRINGER EAST LEASE · API 42-363-35407 · DISTRICT 6E
Stringer East #2
Palo Pinto County · B.R.A. (Congl.) field · Vertical
Stringer East #2 (API 42-363-35407) is a plugged well in Palo Pinto County, plugged July 23, 2015, last operated by Cholla Petroleum Inc..
The RRC has issued one drilling permit (amended once), issued June 23, 2005, permitted to 4,999 ft.
Completion filings report 2 formation tops, including Palo Pinto, Caddo.
Its lease has reported 473 barrels of oil and 204K mcf of gas since January 2006, with no volume in the three years through April 2026.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 23, 2026
- Permits on file
- 1,085
- Phone
- (214) 692-7052
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cholla Petroleum Inc. |
| Production reports | Cholla Petroleum, Inc.through Jul 2015 |
| Latest permit | Cholla Petroleum, Inc.Jun 23, 2005 |
- 4,999
- total depth, ft
- 2
- permits on file
- Jun 23, 2005
- last permit issued
- Jan 16, 2006
- completed
- 473
- cumulative oil, bbl
- 204K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2006 THROUGH Jul 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 16, 2006
- Shut in
- —
- Plugged
- Jul 23, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stringer East G-8-214174 | B.R.A. (Congl.) | Cholla Petroleum, Inc. | 1 | 473 | 204K | Jan 2006 – Jul 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cholla Petroleum, Inc.Jan 2006 → Jul 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 602493-98 | Drill | Cholla Petroleum, Inc. | Jan 17, 2006 | Jun 23, 2005 | Aug 3, 2005 | 4,999 |
| 602493-99 | Drill | Cholla Petroleum, Inc. | Jun 23, 2005 | Jun 23, 2005 | Aug 3, 2005 | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 16, 2006 | Stringer East G-8-214174 | B.R.A. (Congl.) | Cholla Petroleum Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,176 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 410 | 766 |
| Caddo | 3,620 | -2,444 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,128 | 4,134 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 213 | 12.25 | 150 S |
| 4.5 | 4,274 | 7.875 | 140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 8, 2006 | Jan 26, 2006 | Yes |
| 00 | Feb 27, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-35407 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-35407 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36335407, documented in the API reference.