WELL · 42-363-36234 · DISTRICT 7
Dunaway #1
Palo Pinto County · Mineral Wells S.(whitis Sand) field · Vertical
Dunaway #1 (API 42-363-36234) is a plugged well in Palo Pinto County, plugged May 19, 2022, last operated by Dallas Production Company LLC.
The RRC has issued one drilling permit, issued June 3, 2014, permitted to 1,300 ft.
It was permitted by Dallas Production, Inc. and has since transferred to Dallas Production Company LLC on the wellbore schedule.
Completion filings report 9 formation tops, including Atoka, Big Saline, Buttram Sand - Disposal, Caddo.
Operator of record
Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Nov 4, 2025 · 28 permits on file · (405) 436-6429
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dallas Production Company LLC |
| Production reports | Dallas Production, Inc.through Jan 2016 |
| Latest permit | Dallas Production, Inc.Jun 3, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,300
- total depth, ft
- 1
- permits on file
- Jun 3, 2014
- last permit issued
- Sep 22, 2015
- completed
- 0
- cumulative oil, bbl
- 720
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2015 THROUGH May 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 22, 2015
- Shut in
- —
- Plugged
- May 19, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dunaway G-8-278954 | Mineral Wells, S.(whitis Sand) | Dallas Production Company LLC | 1 | 0 | 720 | Sep 2015 – May 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Sep 2015 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 785852-99 | Drill | Dallas Production, Inc. | Apr 30, 2014 | Jun 3, 2014 | Mar 17, 2015 | 1,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-278954 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,028 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| AtokaATOKA - DISPOSAL | — | — |
| Big SalineBIG SALINE - DISPOSAL | — | — |
| Buttram Sand - Disposal | — | — |
| Caddo | — | — |
| CaddoCADDO SAND - DISPOSAL | — | — |
| CanyonCANYON SAND - DISPOSAL | — | — |
| GunsightGUNSIGHT - DISPOSAL | — | — |
| Palo PintoPALO PINTO - DISPOSAL | — | — |
| StrawnSTRAWN - DISPOSAL | — | — |
| Unidentified-County Regular (Gas | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,054 | 1,076 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,303 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 2016 | Dec 30, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-36234 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-36234 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36336234, documented in the API reference.