TEXAS · WELLS · PANOLA COUNTY · API 42-365-30178 · DISTRICT 06

J. S. Gholston #2

Y

Panola County · Carthage (Travis Peak) field · Producing  · Vertical

J. S. Gholston #2 (API 42-365-30178) is a well in Panola County operated by Xto Energy Inc., completed June 23, 2016 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1978 and 2016, permitted to 9,348 ft.

Completion filings report 9 formation tops, including Nacatoch, Blossom, Fredericksburg, Paluxy.

No lease production has been reported under this well’s leases.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Feb 17, 2016
9,348
total depth, ft
2
permits on file
Feb 17, 2016
last permit issued
Jun 23, 2016
completed
0
cumulative oil, bbl
661K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gholston, J.S. G-6-76558Carthage (Cotton Valley)XTO Energy Inc.10412KJan 1993 – Jul 2026
J. S. Gholston G-6-280578Carthage (Travis Peak)XTO Energy Inc.10249KJun 2016 – Jul 2026

Gas, mcf lease total

Last 12 months 1,700 · prior 12 2,403(-29%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
813868-99RecompletionXTO Energy Inc.Feb 15, 2016Feb 17, 2016Jun 8, 20169,348
22540-99DrillExxon Corp.Apr 14, 1978Apr 14, 1978—9,348

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 23, 2016J. S. Gholston G-6-280578Carthage (Travis Peak)XTO Energy Inc.Producing9,348
Aug 21, 1997Gholston J.S. G-6-76558Carthage (Cotton Valley)XTO Energy Inc.Partial Plug · shut in May 1, 20169,348

Formation tops

As filed on W-2/G-1. Subsea from 265 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch900-635
Blossom1,880-1,615
Fredericksburg2,620-2,355
Paluxy3,036-2,771
Glen Rose3,278-3,013
Rodessa4,790-4,525
PettitPETTET5,590-5,325
Travis Peak6,089-5,824
Cotton Valley7,832-7,567

Perforations

Perforated and open-hole intervals.

FromToType
6,0916,312Perforated
8,4408,460Perforated
8,4768,486Perforated
8,6568,662Perforated
8,6788,684Perforated
8,7438,762Perforated
8,7439,170Perforated
8,9458,970Perforated
9,1259,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
146720125 S
1467——
9.6251,52912.25800 S
9.6251,529——
5.59,3328.75206 S
5.59,332——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 19, 2016Jun 28, 2016—
00Dec 10, 1997Oct 3, 1997—
00Jan 12, 1984Nov 17, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530178, documented in the API reference.