TEXAS · WELLS · PANOLA COUNTY · DAVIS, A.L. LEASE · API 42-365-30187 · DISTRICT 06
Davis A.L. #2
Panola County · Carthage (Smith-Allison) field · Vertical
Davis A.L. #2 (API 42-365-30187) is a plugged well in Panola County, plugged June 16, 1999, last operated by Union Pacific Resources Company.
The RRC has issued one drilling permit, issued July 15, 1982, permitted to 7,104 ft.
It was permitted by Champlin Petroleum CO. and has since transferred to Union Pacific Resources Company on the wellbore schedule.
Completion filings report 3 formation tops, including Masseve Anhydrite, Pettit, Travis Peak.
Operator of record
Union Pacific Resources Company
Permitted by Champlin Petroleum Co.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 2, 2000
- Permits on file
- 5,638
- Phone
- (817) 321-7424
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Union Pacific Resources Company |
| Production reports | none |
| Latest permit | Champlin Petroleum Co.Jul 15, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,104
- total depth, ft
- 1
- permits on file
- Jul 15, 1982
- last permit issued
- Aug 14, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 14, 1982
- Shut in
- —
- Plugged
- Jun 16, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis, A.L. O-6-10799 | Carthage (Smith-Allison) | Union Pacific Resources Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 167474-99 | Recompletion | Champlin Petroleum Co. | Jul 15, 1982 | Jul 15, 1982 | — | 7,104 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 14, 1982 | Davis A.L. O-6-10799 | Carthage (Smith-Allison) | Union Pacific Resources Company | Plugged | — |
| Aug 14, 1982 | Davis A.L. O-6-10799 | Carthage (Smith-Allison) | Union Pacific Resources Company | Plugged | — |
| Jun 22, 1976 | Carthage Gas Unit 18 Davis G-6-68031 | Carthage (Travis Peak) | Champlin Petroleum Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 338 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Masseve Anhydrite | 4,945 | -4,607 |
| PettitUPPER PETTIT | 5,895 | -5,557 |
| PettitLOWER PETTIT | 6,045 | -5,707 |
| Travis Peak | 6,270 | -5,932 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,270 | 5,330 | Perforated |
| 6,352 | 6,357 | Perforated |
| 6,420 | 6,540 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 637 | 12.25 | 440 S |
| 8.625 | 637 | — | — |
| 2.375 | 6,332 | — | — |
| 2.375 | 6,370 | — | — |
| 4.5 | 6,615 | 7.875 | 870 S |
| 4.5 | 6,615 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 1990 | Jun 27, 1990 | — |
| 00 | Mar 30, 1990 | Aug 27, 1982 | — |
| 00 | Jan 12, 1984 | Aug 27, 1982 | — |
| 00 | Jan 12, 1984 | Sep 9, 1976 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-30187 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-30187 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 2.44M
- bbl, all reported
- Jan 2000
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000072719 | W-14 Disposal | Plugged Oct 5, 1999 | 5,000 | 2,600 | 5,270–5,330 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 173,143(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36530187, documented in the API reference.