WELL · 42-365-30638 · DISTRICT 6

Caudle, Dahlia O. Unit 1 #1

N

Panola County  · Vertical

Caudle, Dahlia O. Unit 1 #1 (API 42-365-30638) is a permitted well in Panola County filed by Anadarko E&P Onshore LLC; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1977 and 2015, permitted to 9,400 ft.

Completion filings report 6 formation tops, including Paluxy, Glen Rose, Hill, Pettit.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsAnadarko E&P Onshore LLCthrough Dec 2013
Latest permitAnadarko E&P Onshore LLCJul 8, 2015
9,400
total depth, ft
5
permits on file
Jul 8, 2015
last permit issued
—
completed
0
cumulative oil, bbl
184K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caudle, Dahlia O. Unit #1 G-6-201339Carthage (Cotton Valley)Cci East Texas Upstream LLC10159KApr 2003 – Feb 2020
Caudle. Dahlia O. Unit 1 G-6-177825Carthage (Travis Peak)Anadarko E&P Company LP100Jul 1998 – Apr 2003
Caudle, Dahlia O. Unit #1 G-6-75726Carthage (Cotton Valley)Union Pacific Resources Company1024.6KJan 1993 – Jun 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Apr 1995
  2. 2Anadarko E&P Company LPApr 2003 → Dec 2012
  3. 3Anadarko E&P Onshore LLCJan 2013 → Dec 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
806687-99RecompletionAnadarko E&P Onshore LLCMay 18, 2015Jul 8, 2015—9,200
549347-99RecompletionAnadarko E&P Company LPAug 9, 2004Aug 11, 2004—9,000
527848-99RecompletionAnadarko E&P Company LPJan 29, 2003Feb 4, 2003Feb 13, 20039,200
474617-99RecompletionUnion Pacific Resources CompanyMar 23, 1998Mar 23, 1998Mar 25, 19989,200
10060-99DrillSun Exploration & Production Co.Oct 18, 1977Oct 18, 1977Nov 2, 19779,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-75726————
—— G-6-177825————
—— G-6-201339————

Formation tops

As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy2,430-2,218
Glen RoseUPPER GLEN ROSE2,940-2,728
Hill4,900-4,688
Pettit5,660-5,448
Travis Peak6,030-5,818
Cotton Valley8,040-7,828

Perforations

Perforated and open-hole intervals.

FromToType
6,2746,280Perforated
6,2906,300Perforated
8,2988,356Perforated
8,3328,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60012.25550 S
9.6251,600——
5.59,1938.751,770 S
5.59,193——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 14, 2004Jul 16, 2003Yes
00Jun 4, 2004——
00Sep 12, 2000May 24, 2000Yes
00Aug 2, 2000——
00Jan 12, 1984Feb 10, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530638, documented in the API reference.