TEXAS · WELLS · PANOLA COUNTY · API 42-365-30825 · DISTRICT 06

Frost B #2

Plugged

Panola County · Carthage (Travis Peak) field  · Vertical

Frost B #2 (API 42-365-30825) is a plugged well in Panola County, plugged October 30, 2023, last operated by Chevron U. S. A. Inc..

The RRC has issued 3 drilling permits between 1978 and 2006, permitted to 10,950 ft.

Completion filings report 5 formation tops, including Carghage (Glen Rose, Pettit, Carthage (Travis Peak), Carghage (Cotton Valley).

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChevron U. S. A. Inc.
Production reportsChevron U. S. A. Inc.through Dec 2017
Latest permitChevron U. S. A. Inc.Sep 7, 2006
10,950
total depth, ft
3
permits on file
Sep 7, 2006
last permit issued
Nov 23, 2006
completed
0
cumulative oil, bbl
2.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 23, 2006
Shut in
—
Plugged
Oct 30, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frost "B" G-6-85895Carthage (Cotton Valley)Chevron U. S. A. Inc.10143KJan 1993 – Oct 2023
Frost "B" G-6-243364Carthage (Travis Peak)Chevron U. S. A. Inc.101.04MNov 2006 – Oct 2023
Frost "B" G-6-177375Carthage (Glen Rose)Chevron U. S. A. Inc.101.24MApr 2000 – Nov 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Dec 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
625604-99RecompletionChevron U. S. A. Inc.Sep 7, 2006Sep 7, 2006Oct 26, 200610,950
492588-99RecompletionTexaco E & P Inc.Mar 1, 2000Mar 7, 2000Mar 14, 20009,652
33971-99DrillGetty Oil Co.Oct 3, 1978Oct 3, 1978Dec 15, 19789,950

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 23, 2006Frost B G-6-243364Carthage (Travis Peak)Chevron U. S. A. Inc.Plugged—
Apr 11, 2000Frost B G-6-177375Carthage (Glen Rose)Chevron U. S. A. Inc.Plugged—
Dec 14, 1979Frost B G-6-85895Carthage (Cotton Valley)Chevron U. S. A. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 214 ft elevation.Download CSV →

FormationMD ftSubsea
Carghage (Glen Rose3,994-3,780
PettitUPPER PETTIT5,813-5,599
Carthage (Travis Peak)7,872-7,658
Carghage (Cotton Valley)8,621-8,407
Cotton ValleyCOTTON VALLEY SAND8,973-8,759

Perforations

Perforated and open-hole intervals.

FromToType
3,9954,007Perforated
6,6767,008Perforated
9,0519,559Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
165526200 S
9.6252,47312.25950 S
2.3759,020——
5.59,6938.751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 2009Dec 12, 2008Yes
00Jan 2, 2009——
00Jul 27, 2000May 9, 2000Yes
00Jun 29, 2000——
00Jan 12, 1984Jan 17, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530825, documented in the API reference.