TEXAS · WELLS · PANOLA COUNTY · BANKS, W.R. LEASE · API 42-365-30864 · DISTRICT 06

Banks W.R. #2

On schedule

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Banks W.R. #2 (API 42-365-30864) is a well in Panola County operated by Xto Energy Inc., completed September 13, 1979 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 4, 1978, permitted to 9,650 ft.

It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Its lease has reported 5.17K barrels of oil and 1.55M mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

XTO Energy Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitExxon Corp.Dec 4, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,650
total depth, ft
1
permits on file
Dec 4, 1978
last permit issued
Sep 13, 1979
completed
5.17K
cumulative oil, bbl
1.55M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

On this pageLease production

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 13, 1979
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Banks, W.R. G-6-85178Carthage (Cotton Valley)XTO Energy Inc.15.17K1.55MJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 27,515 · prior 12 29,409(-6%)

01K2K3K202420252026

Wells named Banks W.R.

XTO Energy Inc.'s other wells filed under this lease name in Panola County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
37966-99DrillExxon Corp.Dec 4, 1978Dec 4, 1978Jan 19, 19799,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 13, 1979Banks W.R. G-6-85178Carthage (Cotton Valley)XTO Energy Inc.Producing9,650

Perforations

Perforated and open-hole intervals.

FromToType
7,9349,275Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52512.25685 S
2.8757,858——
5.59,6537.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 10, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530864, documented in the API reference.