WELL · 42-365-30936 · DISTRICT 6

Beall-Norman Unit #4

Y

Panola County · Carthage (Pettit Lower Gas) field · Producing  · Vertical

Beall-Norman Unit #4 (API 42-365-30936) is a well in Panola County operated by Tgnr Panola LLC, completed October 29, 2001 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1979 and 2001, permitted to 6,800 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsTGNR Panola LLCthrough Apr 2026
Latest permitTexaco E & P Inc.May 9, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
2
permits on file
May 9, 2001
last permit issued
Oct 29, 2001
completed
0
cumulative oil, bbl
1.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 29, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beall-Norman Unit G-6-183026Carthage (Pettit, Lower Gas)TGNR Panola LLC101.36MMay 2001 – Jul 2026
Beall-Norman Unit G-6-183027Carthage (Pettit, Upper)TGNR Panola LLC1023.4KMay 2001 – Jul 2026
Beall-Norman O-6-11124Carthage (T.P. 6400 SW)Texaco E & P Inc.100Jan 1993 – Jul 2001

Gas, mcf lease total

Last 12 months 18,905 · prior 12 25,809(-27%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.May 2001 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
  3. 3TGNR Panola LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508741-99RecompletionTexaco E & P Inc.May 9, 2001May 9, 2001May 10, 20016,815
47725-99DrillGetty Oil Co.May 3, 1979May 3, 1979Jan 3, 19806,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 29, 2001Beall-Norman Unit G-6-183026Carthage (Pettit Lower Gas)TGNR Panola LLCProducing6,800
May 15, 2001Beall-Norman Unit G-6-183027Carthage (Pettit Upper)TGNR Panola LLCSWR-10-Well · shut in Oct 1, 20016,800
Apr 22, 1980Beall-Norman O-6-11124Carthage (T.P. 6400 SW)Texaco E & P Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
6,0246,032Perforated
6,1926,202Perforated
6,5206,528Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
163026—
8.6252,60312.251,350 S
2.3756,502——
5.56,8007.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 2001Nov 13, 2001—
00Sep 6, 2001Jun 20, 2001Yes
00Jul 9, 2001—Yes
00Jan 12, 1984Jul 15, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36530936, documented in the API reference.