TEXAS · WELLS · PANOLA COUNTY · API 42-365-31008 · DISTRICT 06
Shivers-Peeples Unit #16
Panola County · Carthage (Glen Rose) field · Vertical
Shivers-Peeples Unit #16 (API 42-365-31008) is a plugged well in Panola County, plugged December 1, 2000, last operated by Texaco E & P Inc..
The RRC has issued 2 drilling permits between 1979 and 2000, permitted to 6,800 ft.
Its 2 leases have reported 5.76K barrels of oil and 22 mcf of gas since January 1993, last reporting in June 2001. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Lacy, R., Inc.through Jan 1997 |
| Latest permit | Texaco E & P Inc.Sep 12, 2000 |
- 6,800
- total depth, ft
- 2
- permits on file
- Sep 12, 2000
- last permit issued
- Sep 27, 2000
- completed
- 5.76K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 27, 2000
- Shut in
- —
- Plugged
- Dec 1, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Matthews-Peeples O-6-10254 | Carthage (Travis Peak 6400) | Texaco E & P Inc. | 1 | 5.76K | 22 | Jan 1993 – Jun 2001 |
| Shivers-Peeples Unit G-6-179753 | Carthage (Glen Rose) | Texaco E & P Inc. | 1 | 0 | 0 | Sep 2000 – Nov 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lacy, R., Inc.Jan 1993 → Jan 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 499516-99 | Recompletion | Texaco E & P Inc. | Sep 12, 2000 | Sep 12, 2000 | Sep 14, 2000 | 6,652 |
| 56684-99 | Drill | Lacy, R., Inc. | Aug 29, 1979 | Aug 29, 1979 | Nov 10, 1979 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 27, 2000 | Shivers-Peeples Unit G-6-179753 | Carthage (Glen Rose) | Texaco E & P Inc. | Plugged | — |
| Nov 26, 1979 | Matthews-Peeples O-6-10254 | Carthage (Travis Peak 6400) | Texaco E & P Inc. | Plugged | — |
| Nov 1, 1979 | Matthews-Peeples O-6-10204 | Carthage (T.P. 6400 SW) | Lacy R. Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,970 | 3,978 | Perforated |
| 6,368 | 6,372 | Perforated |
| — | 6,372 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 992 | 12.25 | 500 S |
| 2.375 | 6,354 | — | — |
| 5.5 | 6,583 | 7.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 2001 | Nov 7, 2000 | Yes |
| 00 | Dec 5, 2000 | — | — |
| 00 | Jan 12, 1984 | Jan 23, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36531008, documented in the API reference.