TEXAS · WELLS · PANOLA COUNTY · API 42-365-31020 · DISTRICT 06
Anderson W.G. #2
Panola County · Carthage (Travis Peak-Deadwood) field · Vertical
Anderson W.G. #2 (API 42-365-31020) is a plugged well in Panola County, plugged June 13, 2013, last operated by Chevron U. S. A. Inc..
The RRC has issued 2 drilling permits between 1979 and 2006, permitted to 9,800 ft.
Its 2 leases have reported 4.4K barrels of oil and 216K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 9,293
- Phone
- (866) 212-1212
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chevron U. S. A. Inc. |
| Production reports | Chevron U. S. A. Inc.through Nov 2008 |
| Latest permit | Chevron U. S. A. Inc.May 4, 2006 |
- 9,800
- total depth, ft
- 2
- permits on file
- May 4, 2006
- last permit issued
- Jun 8, 2006
- completed
- 4.4K
- cumulative oil, bbl
- 216K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 8, 2006
- Shut in
- —
- Plugged
- Jun 13, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anderson, W.G. O-6-14604 | Carthage (Travis Peak-Deadwood) | Chevron U. S. A. Inc. | 1 | 3.3K | 56.4K | Jun 2006 – Nov 2008 |
| Anderson, W.G. G-6-89512 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | 1 | 1.1K | 159K | Jan 1993 – May 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Jul 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 618662-99 | Recompletion | Chevron U. S. A. Inc. | May 3, 2006 | May 4, 2006 | May 30, 2006 | 8,600 |
| 58100-99 | Drill | Getty Oil Co. | Sep 17, 1979 | Sep 17, 1979 | Sep 28, 1979 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 8, 2006 | Anderson W.G. O-6-14604 | Carthage (Travis Peak-Deadwood) | Chevron U. S. A. Inc. | Plugged | — |
| Aug 27, 1980 | Anderson W.G. G-6-89512 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,206 | 6,482 | Perforated |
| 8,699 | 9,194 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 57 | 26 | 300 S |
| 9.625 | 2,491 | 12.25 | 1,100 S |
| 2.375 | 8,657 | — | — |
| 5.5 | 9,699 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 2007 | Aug 29, 2006 | Yes |
| 00 | Jan 9, 2007 | — | — |
| 00 | Jan 12, 1984 | Sep 12, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31020 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31020 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36531020, documented in the API reference.