TEXAS · WELLS · PANOLA COUNTY · API 42-365-31109 · DISTRICT 06
Baker J. B. #3
Panola County · Carthage (Travis Peak-Deadwood) field · Vertical
Baker J. B. #3 (API 42-365-31109) is a plugged well in Panola County, plugged June 29, 2018, last operated by Chevron U. S. A. Inc..
The RRC has issued 2 drilling permits (amended once) between 1980 and 2002, permitted to 9,950 ft.
Completion filings report 6 formation tops, including Paluxy, Glen Rose, Rodessa, Pettit.
Its 2 leases have reported 141 barrels of oil and 182K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 9,293
- Phone
- (866) 212-1212
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chevron U. S. A. Inc. |
| Production reports | Chevron U. S. A. Inc.through Jun 2012 |
| Latest permit | Chevron U. S. A. Inc.Aug 1, 2002 |
- 9,950
- total depth, ft
- 3
- permits on file
- Aug 1, 2002
- last permit issued
- Nov 10, 2003
- completed
- 141
- cumulative oil, bbl
- 182K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 2003
- Shut in
- —
- Plugged
- Jun 29, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baker, J. B. G-6-199359 | Carthage (Travis Peak-Deadwood) | Chevron U. S. A. Inc. | 1 | 0 | 118K | Nov 2003 – Jun 2012 |
| Baker, J.B. G-6-92390 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | 1 | 141 | 63.4K | Jan 1993 – May 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 522372-98 | Recompletion | Chevron U. S. A. Inc. | Aug 30, 2002 | Aug 1, 2002 | Nov 6, 2003 | 8,830 |
| 522372-99 | Recompletion | Chevron U. S. A. Inc. | Jul 31, 2002 | Aug 1, 2002 | — | 8,830 |
| 77456-99 | Drill | Getty Oil Co. | Apr 7, 1980 | Apr 7, 1980 | Oct 20, 1980 | 9,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 10, 2003 | Baker J. B. G-6-199359 | Carthage (Travis Peak-Deadwood) | Chevron U. S. A. Inc. | Plugged | — |
| Feb 27, 1981 | Baker J.B. G-6-92390 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 252 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 2,967 | -2,715 |
| Glen Rose | 3,274 | -3,022 |
| Rodessa | 5,025 | -4,773 |
| Pettit | 5,857 | -5,605 |
| Travis Peak | 6,270 | -6,018 |
| Cotton Valley | 8,578 | -8,326 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,544 | 8,572 | Perforated |
| 8,926 | 9,218 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 56 | 26 | — |
| 8.625 | 2,544 | 12.25 | 1,320 S |
| 2.375 | 8,890 | — | — |
| 5.5 | 9,909 | 7.875 | 1,158 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 22, 2004 | Jan 9, 2004 | Yes |
| 00 | Feb 27, 2004 | — | — |
| 00 | Jan 12, 1984 | Mar 18, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31109 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31109 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36531109, documented in the API reference.