TEXAS · WELLS · PANOLA COUNTY · API 42-365-31164 · DISTRICT 06

Williams-Ingram #1

Plugged

Panola County · Carthage (Travis Peak 6450) field  · Vertical

Williams-Ingram #1 (API 42-365-31164) is a plugged well in Panola County, plugged December 13, 2017, last operated by Amplify Energy Operating LLC.

The RRC has issued 2 drilling permits between 1980 and 1991, permitted to 9,650 ft.

It was permitted by Arkla Exploration CO. and has since transferred to Amplify Energy Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Travis Peak, Sligo, Cotton Valley, B/Cotton Valley 'B' Lime.

Operator of record

Amplify Energy Operating LLC

Permitted by Arkla Exploration Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Apr 21, 2025
Permits on file
13
Phone
(713) 490-8900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmplify Energy Operating LLC
Production reportsSeagull Mid-South, Inc.through May 1993
Latest permitArkla Exploration Co.Apr 4, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,650
total depth, ft
2
permits on file
Apr 4, 1991
last permit issued
May 13, 1991
completed
0
cumulative oil, bbl
3.06K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 13, 1991
Shut in
—
Plugged
Dec 13, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams-Ingram G-6-138699Carthage (Travis Peak 6450)Amplify Energy Operating LLC103.06KJan 1993 – Dec 2017
— G-6-92749——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arkla Exploration Co.Jan 1993 → Jan 1993
  2. 2Seagull Mid-South, Inc.Feb 1993 → May 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
386298-99RecompletionArkla Exploration Co.Apr 1, 1991Apr 4, 1991Apr 27, 19919,650
87556-99DrillArkla Exploration Co.Jul 23, 1980Jul 23, 1980Aug 8, 19809,650

Completions

CompletedLeaseFieldOperatorStatusDepth
May 13, 1991Williams-Ingram G-6-138699Carthage (Travis Peak 6450)Amplify Energy Operating LLCPlugged—
Nov 5, 1980Williams-Ingram G-6-92749Carthage (Cotton Valley)Arkla Exploration Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 318 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak6,375-6,057
Sligo6,975-6,657
Cotton Valley8,320-8,002
B/Cotton Valley 'B' Lime8,625-8,307

Perforations

Perforated and open-hole intervals.

FromToType
6,9616,971Perforated
8,5969,509Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37519817.5250 S
8.6252,52112.251,200 S
2.3758,497——
4.59,6507.8751,540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 1991Jun 24, 1991Yes
00Jul 17, 1991——
00Jan 12, 1984Mar 31, 1981Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531164, documented in the API reference.