TEXAS · WELLS · PANOLA COUNTY · PANOLA 2 UNIT LEASE · API 42-365-31196 · DISTRICT 06

Panola 2 Unit #3

Shut in

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Panola 2 Unit #3 (API 42-365-31196) is a well in Panola County operated by Cr2 Energy LLC, completed March 8, 2000 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued 2 drilling permits in 1981, permitted to 9,550 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Cr2 Energy LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Paluxy, Rodessa, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

CR2 Energy LLC

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Kemah, TX
P-5 status
Active – Extension (X)
P-5 last filed
Dec 30, 2025
Phone
(281) 636-2078

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCR2 Energy LLCthrough Mar 2026
Latest permitPhillips Petroleum CompanyJul 16, 1981
9,550
total depth, ft
2
permits on file
Jul 16, 1981
last permit issued
Mar 8, 2000
completed
0
cumulative oil, bbl
772K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 8, 2000
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Panola 2 Unit G-6-98675Carthage (Cotton Valley)CR2 Energy LLC10772KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 368 · prior 12 909(-60%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Tanos Exploration II, LLCJan 2016 → Jun 2021
  4. 4Diversified Production LLCJun 2022 → Nov 2024
  5. 5CR2 Energy LLCOct 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
127553-99DrillPhillips Petroleum CompanyJul 16, 1981Jul 16, 1981—9,550
125707-99DrillPhillips Petroleum CompanyFeb 17, 1981Feb 17, 1981—9,550

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 8, 2000Panola 2 Unit G-6-98675Carthage (Cotton Valley)CR2 Energy LLCProducing · shut in Aug 1, 20269,550

Formation tops

As filed on W-2/G-1. Subsea from 255 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,214-2,959
RodessaRODESSA MAIN5,208-4,953
James LimeJAMES5,630-5,375
Pettit2ND PETTIT6,056-5,801
Travis PeakHOSSTON6,318-6,063
Cotton Valley8,387-8,132

Perforations

Perforated and open-hole intervals.

FromToType
8,0269,368Perforated
8,7228,725Perforated
8,7808,783Perforated
8,9288,931Perforated
9,0269,368Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
145720—
8.6252,29511959 S
2.3758,899——
4.59,5427.8751,875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2000Apr 12, 2000—
00Jan 12, 1984Apr 9, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531196, documented in the API reference.