TEXAS · WELLS · PANOLA COUNTY · NEAL, JOHN S. UNIT LEASE · API 42-365-31224 · DISTRICT 06

Neal John S. Unit #2

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Neal John S. Unit #2 (API 42-365-31224) is a well in Panola County operated by Tgnr East Texas LLC, completed June 10, 1981 and listed as temp abandoned on the RRC schedule, shut in June 1, 2017.

The RRC has issued one drilling permit, issued February 2, 1981, permitted to 9,450 ft.

It was permitted by Sun Expl. & Prod. CO.-Lafayette and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Its lease has reported 4.4K barrels of oil and 1.03M mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Sun Expl. & Prod. Co.-Lafayette; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough May 2017
Latest permitSun Expl. & Prod. Co.-LafayetteFeb 2, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,450
total depth, ft
1
permits on file
Feb 2, 1981
last permit issued
Jun 10, 1981
completed
4.4K
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2017

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 10, 1981
Shut in
Jun 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal, John S. Unit G-6-94223Carthage (Cotton Valley)TGNR East Texas LLC14.4K1.03MJan 1993 – May 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Aug 2000
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Oct 2015
  5. 5Cci East Texas Upstream LLCMar 2017 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
107383-99DrillSun Expl. & Prod. Co.-LafayetteFeb 2, 1981Feb 2, 1981Feb 6, 19819,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1981Neal John S. Unit G-6-94223Carthage (Cotton Valley)TGNR East Texas LLCTemp Abandoned · shut in Jun 1, 20179,450

Perforations

Perforated and open-hole intervals.

FromToType
9,0399,151Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,69712.25725 S
2.8758,374——
5.59,4508.751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531224, documented in the API reference.