TEXAS · WELLS · PANOLA COUNTY · POSS, L.T. UNIT LEASE · API 42-365-31279 · DISTRICT 06

Poss L.T. Unit #2

Plugged

Panola County · Carthage (Cotton Valley) field  · Vertical

Poss L.T. Unit #2 (API 42-365-31279) is a plugged well in Panola County, plugged June 14, 2016, last operated by Anadarko E&P Onshore LLC.

The RRC has issued one drilling permit, issued June 15, 1981, permitted to 9,500 ft.

It was permitted by Union Oil Company Of California and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Union Oil Company of California; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Apr 2016
Latest permitUnion Oil Company of CaliforniaJun 15, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
1
permits on file
Jun 15, 1981
last permit issued
Nov 29, 1997
completed
0
cumulative oil, bbl
841K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 29, 1997
Shut in
—
Plugged
Jun 14, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Poss, L.T. Unit G-6-98595Carthage (Cotton Valley)Anadarko E&P Onshore LLC10841KJan 1993 – Jun 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
121076-99DrillUnion Oil Company of CaliforniaJun 15, 1981Jun 15, 1981Oct 14, 19819,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 29, 1997Poss L.T. Unit G-6-98595Carthage (Cotton Valley)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 302 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,020-4,718
James LimeJAMES5,450-5,148
PettitPETTET5,730-5,428
Travis Peak6,201-5,899
Cotton Valley8,171-7,869
BossierBOSSIER SHALE9,299-8,997

Perforations

Perforated and open-hole intervals.

FromToType
8,4408,460Perforated
9,0189,065Perforated
9,0189,127Perforated
9,0819,127Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1674——
9.6252,71512.251,100 S
2.8758,329——
5.59,3757.8751,404 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 1998Jan 16, 1998—
00Jan 12, 1984Mar 20, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531279, documented in the API reference.