TEXAS · WELLS · PANOLA COUNTY · API 42-365-31384 · DISTRICT 06
Carthage Gas Unit No. 9 #5
Panola County · Carthage (Travis Peak) field · Not Eligible for Allowable · Vertical
Carthage Gas Unit NO. 9 #5 (API 42-365-31384) is a well in Panola County operated by Mmgl East Texas Iii LLC, completed May 4, 1999 and listed as not eligible for allowable on the RRC schedule, shut in November 1, 2018.
The RRC has issued 3 drilling permits between 1981 and 2001, permitted to 9,680 ft.
It was permitted by Amoco Production Company and has since transferred to Mmgl East Texas Iii LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak.
Its 3 leases have reported 9.07K barrels of oil and 1.09M mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Amoco Production Company; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 3, 2025
- Phone
- (972) 701-8377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mmgl East Texas III LLC |
| Production reports | Mmgl East Texas III, LLCthrough Oct 2018 |
| Latest permit | Amoco Production CompanySep 5, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,680
- total depth, ft
- 3
- permits on file
- Sep 5, 2001
- last permit issued
- May 4, 1999
- completed
- 9.07K
- cumulative oil, bbl
- 1.09M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2018
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 4, 1999
- Shut in
- Nov 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carthage Gas Unit 9 G-6-186660 | Carthage (Cotton Valley) | Mmgl East Texas III, LLC | 1 | 7.4K | 454K | Nov 2001 – Oct 2018 |
| Carthage Gas Unit No. 9 G-6-173377 | Carthage (Travis Peak) | Mmgl East Texas III, LLC | 1 | 1.12K | 151K | May 1999 – Oct 2001 |
| Carthage Gas Unit No. 9 G-6-98590 | Carthage (Cotton Valley) | Amoco Production Company | 1 | 556 | 489K | Jan 1993 – Apr 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Amoco Production CompanyJan 1993 → Oct 2001
- 2BP America Production CompanyNov 2001 → Oct 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 513252-99 | Recompletion | Amoco Production Company | Aug 31, 2001 | Sep 5, 2001 | Oct 11, 2001 | 10,000 |
| 483861-99 | Recompletion | Amoco Production Company | Apr 14, 1999 | Apr 14, 1999 | Apr 29, 1999 | 10,000 |
| 144044-99 | Drill | Amoco Production Company | Dec 4, 1981 | Dec 4, 1981 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 1, 2001 | Carthage Gas Unit 9 G-6-186660 | Carthage (Cotton Valley) | Mmgl East Texas III LLC | Temp Abandoned · shut in Nov 1, 2018 | 9,680 |
| May 4, 1999 | Carthage Gas Unit No. 9 G-6-173377 | Carthage (Travis Peak) | Mmgl East Texas III LLC | Not Eligible for Allowable · shut in Oct 1, 2001 | 9,680 |
| Oct 14, 1990 | Carthage Gas Unit No. 9 G-6-98590 | Carthage (Cotton Valley) | Amoco Production Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 4,642 | -4,432 |
| Rodessa | 4,893 | -4,683 |
| Pettit | 5,660 | -5,450 |
| Travis Peak | 6,130 | -5,920 |
| Cotton Valley | 8,088 | -7,878 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,802 | 7,818 | Perforated |
| 8,476 | 8,480 | Perforated |
| 8,476 | 9,548 | Perforated |
| 8,488 | 8,495 | Perforated |
| 8,500 | 8,505 | Perforated |
| 8,522 | 8,544 | Perforated |
| 8,572 | 8,578 | Perforated |
| 9,488 | 9,548 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 80 | 26 | 310 S |
| 9.625 | 1,693 | 12.25 | 730 S |
| 2.875 | 9,430 | — | — |
| 5.5 | 9,671 | 8.75 | 1,830 S |
| 5.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 12, 2002 | Jan 7, 2002 | — |
| 00 | Feb 4, 2002 | — | — |
| 00 | Jul 20, 1999 | May 24, 1999 | Yes |
| 00 | Jul 9, 1999 | — | — |
| 00 | Feb 4, 1991 | Dec 19, 1990 | — |
| 00 | Jan 12, 1984 | Apr 1, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31384 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31384 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.