WELL · 42-365-31705 · DISTRICT 6

Lawless Unit #6

Plugged

Panola County · Bethany East (Cotton Valley) field  · Vertical

Lawless Unit #6 (API 42-365-31705) is a plugged well in Panola County, plugged April 4, 2022, last operated by Xto Energy Inc..

The RRC has issued 3 drilling permits between 1984 and 1992, permitted to 10,100 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Operator of record

XTO Energy Inc.

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Jan 2018
Latest permitFina Oil & Chemical CompanyDec 23, 1992
10,100
total depth, ft
3
permits on file
Dec 23, 1992
last permit issued
May 25, 1997
completed
0
cumulative oil, bbl
810K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 25, 1997
Shut in
—
Plugged
Apr 4, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lawless Unit G-6-117037Deberry (Cotton Valley Lower)XTO Energy Inc.10507KJan 1993 – Mar 2022
Lawless G-6-147300Bethany, East (Cotton Valley)Fina Oil & Chemical Company10303KMay 1993 – Aug 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyApr 1993 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Feb 2006
  4. 4XTO Energy Inc.Mar 2006 → Jan 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407355-99OtherFina Oil & Chemical CompanyDec 17, 1992Dec 23, 1992Dec 20, 19929,525
266893-99DrillTenneco Oil Co.Feb 4, 1985Feb 15, 1985Mar 8, 198510,100
256439-99DrillTenneco Oil Co.Oct 2, 1984Nov 12, 1984—10,100

Completions

CompletedLeaseFieldOperatorStatusDepth
May 25, 1997Lawless Unit G-6-117037Bethany East (Cotton Valley)XTO Energy Inc.Plugged—
May 1, 1993Lawless G-6-147300Bethany East (Cotton Valley)Fina Oil & Chemical CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 294 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa4,850-4,556
Pettit5,746-5,452
Travis Peak6,204-5,910
Cotton Valley8,250-7,956

Perforations

Perforated and open-hole intervals.

FromToType
8,2528,415Perforated
8,2528,640Perforated
8,5628,640Perforated
8,6858,690Perforated
9,3289,335Perforated
9,3289,448Perforated
9,3649,367Perforated
9,3739,374Perforated
9,4449,448Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,50514.752,065 S
7.8759,1629.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 10, 2006Jun 12, 2006—
00Jan 20, 1994Jul 15, 1993—
00Dec 7, 1993—Yes
00Sep 16, 1985Jun 19, 1985—
00Sep 10, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531705, documented in the API reference.