TEXAS · WELLS · PANOLA COUNTY · CGU 28 LEASE · API 42-365-31762 · DISTRICT 06

Cgu 28 #4

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Cgu 28 #4 (API 42-365-31762) is a well in Panola County operated by Tgnr East Texas LLC, completed September 7, 1985 and listed as temp abandoned on the RRC schedule, shut in August 1, 2013.

The RRC has issued one drilling permit, issued May 3, 1985, permitted to 9,900 ft.

It was permitted by Champlin Petroleum CO. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.

Its lease has reported 1.14M mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Champlin Petroleum Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Jul 2013
Latest permitChamplin Petroleum Co.May 3, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
1
permits on file
May 3, 1985
last permit issued
Sep 7, 1985
completed
0
cumulative oil, bbl
1.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2013

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 7, 1985
Shut in
Aug 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 28 G-6-118757Carthage (Cotton Valley)TGNR East Texas LLC101.14MJan 1993 – Jul 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Jul 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
274046-99DrillChamplin Petroleum Co.Apr 23, 1985May 3, 1985Jun 12, 198510,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 7, 1985Cgu 28 G-6-118757Carthage (Cotton Valley)TGNR East Texas LLCTemp Abandoned · shut in Aug 1, 20139,900

Formation tops

As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,390-5,045
James LimeJAMES5,860-5,515
Pettit6,105-5,760
Travis Peak6,455-6,110
Cotton Valley8,390-8,045

Perforations

Perforated and open-hole intervals.

FromToType
9,1679,424Perforated
9,5659,583Perforated
9,7419,767Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,68312.25897 S
4.59,9008.752,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 25, 1985Oct 14, 1985Yes
00Nov 19, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531762, documented in the API reference.