TEXAS · WELLS · PANOLA COUNTY · BLOUNT LEASE · API 42-365-31887 · DISTRICT 06

Blount #3

Shut in

Panola County · Joaquin (Wiener) field · Temp Abandoned  · Vertical

Blount #3 (API 42-365-31887) is a well in Panola County operated by Tgnr East Texas II LLC, completed May 18, 1988 and listed as temp abandoned on the RRC schedule, shut in January 1, 2014.

The RRC has issued one drilling permit, issued February 12, 1988, permitted to 7,600 ft.

It was permitted by Marshall Expl. Inc. and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.

Completion filings report 6 formation tops, including B/Austin Chalk, Fredricksburg, Glen Rose, B/Massive Anhydrite.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas II LLC

Permitted by Marshall Expl. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2026
Permits on file
162
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas II LLC
Production reportsSamson Lone Star, LLCthrough Dec 2013
Latest permitMarshall Expl. Inc.Feb 12, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
1
permits on file
Feb 12, 1988
last permit issued
May 18, 1988
completed
0
cumulative oil, bbl
632K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 18, 1988
Shut in
Jan 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blount G-6-127809Joaquin (Wiener)TGNR East Texas II LLC10632KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJan 1993 → Jan 1998
  2. 2Mass Energy, IncFeb 1998 → May 1999
  3. 3Gruy Petroleum Management Co.Jun 1999 → Jan 2001
  4. 4Samson Lone Star LPFeb 2001 → Jun 2007
  5. 5Samson Lone Star, LLCJul 2007 → Dec 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
342548-99DrillMarshall Expl. Inc.Feb 11, 1988Feb 12, 1988—7,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 18, 1988Blount G-6-127809Joaquin (Wiener)TGNR East Texas II LLCTemp Abandoned · shut in Jan 1, 20147,600

Formation tops

As filed on W-2/G-1. Subsea from 176 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk2,550-2,374
Fredricksburg2,576-2,400
Glen RoseGLENROSE3,118-2,942
B/Massive Anhydrite4,846-4,670
James LimeJAMES5,406-5,230
Pettit5,730-5,554

Perforations

Perforated and open-hole intervals.

FromToType
6,4626,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00512.25600 S
4.57,5947.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 1988Jun 28, 1988Yes
00Jul 28, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531887, documented in the API reference.