TEXAS · WELLS · PANOLA COUNTY · API 42-365-31897 · DISTRICT 06
Smith Ella Unit 2 #4
Panola County · Carthage (Travis Peak) field · Producing · Vertical
Smith Ella Unit 2 #4 (API 42-365-31897) is a well in Panola County operated by Tgnr East Texas LLC, completed September 2, 2013 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1988 and 2013, permitted to 9,755 ft.
It was permitted by Anadarko E&P Onshore LLC and has since transferred to Tgnr East Texas LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Blossom, Paluxy, Pettit, Travis Peak.
Its 2 leases have reported 1.03K barrels of oil and 538K mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Anadarko E&P Onshore LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 41
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas LLC |
| Production reports | TGNR East Texas LLCthrough Apr 2026 |
| Latest permit | Anadarko E&P Onshore LLCJun 21, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,755
- total depth, ft
- 2
- permits on file
- Jun 21, 2013
- last permit issued
- Sep 2, 2013
- completed
- 1.03K
- cumulative oil, bbl
- 538K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 2, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith, Ella Unit 2 G-6-275914 | Carthage (Travis Peak) | TGNR East Texas LLC | 1 | 1 | 251K | Sep 2013 – Apr 2026 |
| Smith, Ella Unit 2 G-6-129554 | Carthage (Cotton Valley) | Anadarko E&P Onshore LLC | 1 | 1.03K | 287K | Jan 1993 – Mar 2009 |
Gas, mcf lease total
Last 12 months 1,179 · prior 12 8,313(-86%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lacy, R., Inc.Jan 1993 → Dec 1997
- 2Union Pacific Resources CompanyJan 1998 → Jan 2001
- 3Rme Petroleum CompanyFeb 2001 → Nov 2002
- 4Anadarko E&P Company LPDec 2002 → Mar 2009
- 5Anadarko E&P Onshore LLCSep 2013 → Nov 2016
- 6Cci East Texas Upstream LLCDec 2016 → Jan 2021
- 7TGNR East Texas LLCFeb 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 764965-99 | Recompletion | Anadarko E&P Onshore LLC | Jun 19, 2013 | Jun 21, 2013 | Aug 9, 2013 | 10,000 |
| 347199-99 | Drill | Lacy, R., Inc. | May 31, 1988 | Jun 3, 1988 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 2, 2013 | Smith Ella Unit 2 G-6-275914 | Carthage (Travis Peak) | TGNR East Texas LLC | Producing | 9,755 |
| Jan 28, 1989 | Smith Ella Unit 2 G-6-129554 | Carthage (Cotton Valley) | Anadarko E&P Onshore LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 197 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Blossom | 2,027 | -1,830 |
| Paluxy | 2,870 | -2,673 |
| Pettit | 4,640 | -4,443 |
| Travis Peak | 6,145 | -5,948 |
| Cotton Valley | 8,136 | -7,939 |
| Taylor | 9,564 | -9,367 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,247 | 6,480 | Perforated |
| 8,365 | 8,379 | Perforated |
| 9,060 | 9,074 | Perforated |
| 9,564 | 9,578 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 42 | 24 | 135 S |
| 9.625 | 2,200 | 12.25 | 670 S |
| 5.5 | 9,755 | 8.75 | 1,725 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 2015 | Feb 19, 2014 | — |
| 00 | Mar 13, 1989 | Feb 21, 1989 | — |
| 00 | Feb 10, 1989 | Jan 4, 1989 | Yes |
| 00 | Jan 31, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-31897 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-31897 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36531897, documented in the API reference.