WELL · 42-365-31981 · DISTRICT 6

Blount #4

Y

Panola County · Joaquin (Wiener) field · Temp Abandoned  · Vertical

Blount #4 (API 42-365-31981) is a well in Panola County operated by Tgnr East Texas II LLC, completed August 3, 2005 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 14, 1988, permitted to 7,500 ft.

It was permitted by Marshall Expl. Inc. and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.

Completion filings report 6 formation tops, including B/Austin Chalk, Fredricksburg, Paluxy, Glen Rose.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas II LLC

Permitted by Marshall Expl. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2026
Permits on file
162
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas II LLC
Production reportsSamson Lone Star, LLCthrough Jun 2011
Latest permitMarshall Expl. Inc.Nov 14, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Nov 14, 1988
last permit issued
Aug 3, 2005
completed
0
cumulative oil, bbl
215K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 3, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blount G-6-129660Joaquin (Wiener)TGNR East Texas II LLC10215KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJan 1993 → Feb 1995
  2. 2Brammer-Keystone Energy, L.L.C.Nov 1997 → Jan 1998
  3. 3Mass Energy, IncMar 1998 → May 1999
  4. 4Gruy Petroleum Management Co.Jun 1999 → Jan 2001
  5. 5Samson Lone Star LPMay 2001 → Jun 2007
  6. 6Samson Lone Star, LLCJul 2007 → Jun 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
353195-98DrillMarshall Expl. Inc.Jan 6, 1989Nov 14, 1988—7,250
353195-99DrillMarshall Expl. Inc.Nov 10, 1988Nov 14, 1988—7,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-129660————

Formation tops

As filed on W-2/G-1. Subsea from 174 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk2,554-2,380
Fredricksburg2,580-2,406
Paluxy2,812-2,638
Glen RoseGLENROSE3,112-2,938
Mooringsport3,950-3,776
B/Massive Anhydrite4,838-4,664

Perforations

Perforated and open-hole intervals.

FromToType
6,4766,487Perforated
7,1777,188Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00212.25625 S
4.57,2457.8751,025 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 2006Dec 13, 2005—
00Feb 13, 1989Jan 6, 1989Yes
00Feb 8, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36531981, documented in the API reference.