TEXAS · WELLS · PANOLA COUNTY · CGU 33 LEASE · API 42-365-32131 · DISTRICT 06

Cgu 33 #5

Plugged

Panola County · Carthage (Cotton Valley) field  · Directional

Cgu 33 #5 (API 42-365-32131) is a plugged well in Panola County, plugged April 6, 2016, last operated by Anadarko E&P Onshore LLC.

The RRC has issued one drilling permit, issued June 27, 1989, permitted to 12,500 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Glen Rose, James Lime, Pettit, Travis Peak.

Its lease has reported 984K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Mar 2016
Latest permitUnion Pacific Resources CompanyJun 27, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Jun 27, 1989
last permit issued
May 24, 1990
completed
0
cumulative oil, bbl
984K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 24, 1990
Shut in
—
Plugged
Apr 6, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 33 G-6-135742Carthage (Cotton Valley)Anadarko E&P Onshore LLC10984KJan 1993 – Mar 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360851-99DrillUnion Pacific Resources CompanyJun 27, 1989Jun 27, 1989—12,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 24, 1990Cgu 33 G-6-135742Carthage (Cotton Valley)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 281 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose3,345-3,064
James Lime5,490-5,209
PettitUPPER PETTIT5,755-5,474
PettitLOWER PETTIT5,915-5,634
Travis Peak6,120-5,839
Cotton Valley8,125-7,844

Perforations

Perforated and open-hole intervals.

FromToType
8,99610,172Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,52217.51,390 S
9.6255,70512.251,630 S
4.510,3258.51,720 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 5, 1990Jul 6, 1990Yes
00Oct 11, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532131, documented in the API reference.