TEXAS · WELLS · PANOLA COUNTY · HARRELL, JEANETTE LEASE · API 42-365-32344 · DISTRICT 06

Harrell Jeanette #5

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Harrell Jeanette #5 (API 42-365-32344) is a well in Panola County operated by Tgnr Panola LLC, completed March 25, 1991 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 21, 1990, permitted to 10,006 ft.

It was permitted by Texaco Producing Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Paluxy, Mass. Anhy., Pettit, Travis Peak.

Its lease has reported 983K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

TGNR Panola LLC

Permitted by Texaco Producing Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Apr 2026
Latest permitTexaco Producing Inc.Jun 21, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,006
total depth, ft
1
permits on file
Jun 21, 1990
last permit issued
Mar 25, 1991
completed
0
cumulative oil, bbl
983K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 25, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harrell, Jeanette G-6-138290Carthage (Cotton Valley)TGNR Panola LLC10983KJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 16,754 · prior 12 18,253(-8%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
  3. 3TGNR Panola LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
373221-99DrillTexaco Producing Inc.May 11, 1990Jun 21, 1990Jan 17, 199111,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 25, 1991Harrell Jeanette G-6-138290Carthage (Cotton Valley)TGNR Panola LLCProducing10,006

Formation tops

As filed on W-2/G-1. Subsea from 407 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,365-2,958
Mass. Anhy.5,210-4,803
Pettit6,138-5,731
Travis Peak6,528-6,121
Cotton Valley8,798-8,391

Perforations

Perforated and open-hole intervals.

FromToType
8,7989,060Perforated
9,5809,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1460——
9.6252,50612.251,100 S
5.510,0068.751,575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 13, 1991Apr 16, 1991Yes
00Jun 7, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532344, documented in the API reference.