TEXAS · WELLS · PANOLA COUNTY · API 42-365-32439 · DISTRICT 06
Poss L.T. Unit #4
Panola County · Carthage (Travis Peak-Smith S.) field · Shut In-Multi-Compl · Vertical
Poss L.T. Unit #4 (API 42-365-32439) is a well in Panola County operated by Tgnr East Texas LLC, completed March 31, 2000 and listed as shut in-multi-compl on the RRC schedule, shut in January 1, 2014.
The RRC has issued 2 drilling permits between 1991 and 1993, permitted to 9,450 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Lower Duck Creek, Massive Anhydrite (marker), James Lime, Pettit.
Its 3 leases have reported 11.5K barrels of oil and 553K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 41
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas LLC |
| Production reports | TGNR East Texas LLCthrough Dec 2013 |
| Latest permit | Union Pacific Resources CompanyFeb 25, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,450
- total depth, ft
- 2
- permits on file
- Feb 25, 1993
- last permit issued
- Mar 31, 2000
- completed
- 11.5K
- cumulative oil, bbl
- 553K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2013
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 31, 2000
- Shut in
- Jan 1, 2014
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Poss, L.T. Unit G-6-141001 | Carthage (Cotton Valley) | TGNR East Texas LLC | 1 | 5.29K | 360K | Jan 1993 – Dec 2013 |
| Poss, L.T. Unit G-6-144488 | Carthage (Travis Peak-Smith, S.) | TGNR East Texas LLC | 1 | 6.22K | 191K | Feb 1993 – Jul 2000 |
| L. T. Poss Unit G-6-142249 | Carthage (Travis Peak-Poss) | Union Pacific Resources Company | 1 | 27 | 1.38K | Jan 1993 – Jan 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Nov 2012
- 4Anadarko E&P Onshore LLCDec 2013 → Dec 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409280-99 | Recompletion | Union Pacific Resources Company | Feb 23, 1993 | Feb 25, 1993 | Feb 2, 1993 | 9,450 |
| 384577-99 | Drill | Union Pacific Resources Company | Feb 12, 1991 | Feb 12, 1991 | Nov 27, 1991 | 9,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 31, 2000 | Poss L.T. Unit G-6-144488 | Carthage (Travis Peak-Smith S.) | TGNR East Texas LLC | Shut In-Multi-Compl · shut in Oct 1, 2000 | 9,450 |
| May 1, 1992 | Poss L.T. Unit G-6-141001 | Carthage (Cotton Valley) | TGNR East Texas LLC | Temp Abandoned · shut in Jan 1, 2014 | 9,450 |
| May 1, 1992 | L. T. Poss Unit G-6-142249 | Carthage (Travis Peak-Poss) | Union Pacific Resources Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 269 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lower Duck Creek | 2,484 | -2,215 |
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 4,927 | -4,658 |
| James LimeJAMES | 5,426 | -5,157 |
| Pettit | 5,708 | -5,439 |
| Travis Peak | 6,089 | -5,820 |
| Cotton Valley | 8,228 | -7,959 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,309 | 6,319 | Perforated |
| 6,367 | 6,379 | Perforated |
| 6,496 | 6,506 | Perforated |
| 8,428 | 8,472 | Perforated |
| 8,498 | 8,510 | Perforated |
| 8,826 | 8,840 | Perforated |
| 8,876 | 8,902 | Perforated |
| 8,959 | 8,982 | Perforated |
| 9,164 | 9,166 | Perforated |
| 9,298 | 9,312 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,916 | 14.75 | 1,400 S |
| 2.875 | 6,655 | 7.875 | 1,336 S |
| 2.875 | 6,655 | — | 1,336 S |
| 4.5 | 9,425 | 9.875 | 420 S |
| 2.875 | — | 7.875 | 1,336 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2000 | Aug 1, 2000 | — |
| 00 | Apr 30, 1993 | Mar 2, 1993 | Yes |
| 00 | Mar 30, 1993 | — | — |
| 00 | Oct 1, 1992 | May 13, 1992 | Yes |
| 00 | Sep 24, 1992 | — | — |
| 00 | Jun 26, 1992 | May 26, 1992 | — |
| 00 | Apr 20, 1992 | Mar 24, 1992 | Yes |
| 00 | Apr 3, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32439 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32439 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.