TEXAS · WELLS · PANOLA COUNTY · WERNER, LOUIS LEASE · API 42-365-32508 · DISTRICT 06
Werner Louis #2
Panola County · Carthage SE (CV) field · Temp Abandoned · Vertical
Werner Louis #2 (API 42-365-32508) is a well in Panola County operated by Tgnr East Texas II LLC, completed November 29, 1992 and listed as temp abandoned on the RRC schedule, shut in April 1, 2024.
The RRC has issued one drilling permit (amended once), issued June 25, 1991, permitted to 9,600 ft.
It was permitted by Kerr-Mcgee Corporation and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Mass. Anhydrite, Rodessa, James Lime, Pettit.
Its lease has reported 32.4K barrels of oil and 1.99M mcf of gas since January 1993, last reporting volume in March 2024.
Operator of record
Permitted by Kerr-McGee Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 162
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas II LLC |
| Production reports | TGNR East Texas II LLCthrough Mar 2024 |
| Latest permit | Kerr-McGee CorporationJun 25, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,600
- total depth, ft
- 2
- permits on file
- Jun 25, 1991
- last permit issued
- Nov 29, 1992
- completed
- 32.4K
- cumulative oil, bbl
- 1.99M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2024
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 29, 1992
- Shut in
- Apr 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Werner, Louis G-6-143523 | Carthage, SE (CV) | TGNR East Texas II LLC | 1 | 32.4K | 1.99M | Jan 1993 – Mar 2024 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kerr-McGee CorporationJan 1993 → Jul 1996
- 2Nuevo Energy CompanyAug 1996 → Dec 1998
- 3Samson Lone Star LPJan 1999 → Jun 2007
- 4Samson Lone Star, LLCJul 2007 → Sep 2017
- 5Rockcliff Energy Operating LLCOct 2017 → Nov 2023
- 6TGNR East Texas II LLCJan 2024 → Mar 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 389049-98 | Drill | Kerr-McGee Corporation | Jun 23, 1992 | Jun 25, 1991 | Oct 2, 1992 | 9,800 |
| 389049-99 | Drill | Kerr-McGee Corporation | Jun 18, 1991 | Jun 25, 1991 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 29, 1992 | Werner Louis G-6-143523 | Carthage SE (CV) | TGNR East Texas II LLC | Temp Abandoned · shut in Apr 1, 2024 | 9,600 |
Formation tops
As filed on W-2/G-1. Subsea from 192 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Mass. Anhydrite | 4,688 | -4,496 |
| Rodessa | 4,897 | -4,705 |
| James LimeJAMES | 5,409 | -5,217 |
| Pettit | 5,705 | -5,513 |
| Travis Peak | 6,107 | -5,915 |
| Cotton ValleyCOTTON VALLEY "B" | 8,412 | -8,220 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,584 | 8,623 | Perforated |
| 8,810 | 8,844 | Perforated |
| 9,376 | 9,418 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,795 | 11 | 600 S |
| 4.5 | 9,592 | 7.875 | 1,970 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 25, 1993 | Jan 28, 1993 | — |
| 00 | Jan 25, 1993 | Dec 28, 1992 | Yes |
| 00 | Jan 13, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32508 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32508 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532508, documented in the API reference.