TEXAS · WELLS · PANOLA COUNTY · API 42-365-32543 · DISTRICT 06
Crnko-Biggs #2
Panola County · Carthage SE (CV) field · Producing · Vertical
Crnko-Biggs #2 (API 42-365-32543) is a well in Panola County operated by Tgnr East Texas II LLC, completed March 28, 1992 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued August 7, 1991, permitted to 9,650 ft.
It was permitted by Kerr-Mcgee Corporation and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.
Completion filings report 7 formation tops, including Bha, BMA, Se Hill, James Lime.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Kerr-McGee Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 162
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas II LLC |
| Production reports | TGNR East Texas II LLCthrough Apr 2026 |
| Latest permit | Kerr-McGee CorporationAug 7, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,650
- total depth, ft
- 2
- permits on file
- Aug 7, 1991
- last permit issued
- Mar 28, 1992
- completed
- 0
- cumulative oil, bbl
- 1.74M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 28, 1992
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crnko-Biggs G-6-141450 | Carthage, SE (CV) | TGNR East Texas II LLC | 1 | 0 | 1.66M | Jan 1993 – Jul 2026 |
| Crnko-Briggs G-6-141451 | Carthage (Travis Peak-Collins) | TGNR East Texas II LLC | 1 | 0 | 86.6K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 14,057 · prior 12 17,762(-21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kerr-McGee CorporationJan 1993 → Jul 1996
- 2Nuevo Energy CompanyAug 1996 → Dec 1998
- 3Samson Lone Star LPJan 1999 → Jun 2007
- 4Samson Lone Star, LLCJul 2007 → Sep 2017
- 5Rockcliff Energy Operating LLCOct 2017 → Nov 2023
- 6TGNR East Texas II LLCDec 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 390570-98 | Drill | Kerr-McGee Corporation | Feb 20, 1992 | Aug 7, 1991 | — | 9,650 |
| 390570-99 | Drill | Kerr-McGee Corporation | Aug 5, 1991 | Aug 7, 1991 | Dec 17, 1992 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 28, 1992 | Crnko-Biggs G-6-141450 | Carthage SE (CV) | TGNR East Texas II LLC | Producing | 9,650 |
| Mar 23, 1992 | Crnko-Briggs G-6-141451 | Carthage (Travis Peak-Collins) | TGNR East Texas II LLC | Temp Abandoned · shut in Oct 1, 2000 | 9,650 |
Formation tops
As filed on W-2/G-1. Subsea from 183 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bha | 4,908 | -4,725 |
| BMA | 4,908 | -4,725 |
| SE Hill | 4,950 | -4,767 |
| James LimeJAMES | 5,421 | -5,238 |
| Pettit | 5,720 | -5,537 |
| PettitLOWER PETTIT | 5,916 | -5,733 |
| Travis Peak | 6,124 | -5,941 |
| Cotton Valley | 8,542 | -8,359 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,126 | 6,136 | Perforated |
| 8,638 | 8,708 | Perforated |
| 8,863 | 9,105 | Perforated |
| 9,470 | 9,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,836 | 11 | 600 S |
| 4.5 | 9,650 | 7.875 | 1,756 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 1992 | May 6, 1992 | Yes |
| 00 | Jun 8, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32543 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32543 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532543, documented in the API reference.