TEXAS · WELLS · PANOLA COUNTY · NEAL, SALLIE J. UNIT LEASE · API 42-365-32635 · DISTRICT 06

Neal Sallie J. Unit #8

Shut in

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Neal Sallie J. Unit #8 (API 42-365-32635) is a well in Panola County operated by Tgnr East Texas LLC, completed September 10, 1992 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued May 11, 1992, permitted to 9,425 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Paluxy, Glen Rose, Massive Anhydrite (marker), Pettit.

Its lease has reported 15K barrels of oil and 1.23M mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitUnion Pacific Resources CompanyMay 11, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,425
total depth, ft
1
permits on file
May 11, 1992
last permit issued
Sep 10, 1992
completed
15K
cumulative oil, bbl
1.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 10, 1992
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal, Sallie J. Unit G-6-142713Carthage (Cotton Valley)TGNR East Texas LLC115K1.23MJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 2,627 · prior 12 4,269(-38%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  5. 5Cci East Texas Upstream LLCDec 2016 → Apr 2020
  6. 6TGNR East Texas LLCMay 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398998-99DrillUnion Pacific Resources CompanyMay 5, 1992May 11, 1992Jun 28, 199210,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 10, 1992Neal Sallie J. Unit G-6-142713Carthage (Cotton Valley)TGNR East Texas LLCProducing · shut in Aug 1, 20269,425

Formation tops

As filed on W-2/G-1. Subsea from 313 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy2,863-2,550
Glen Rose3,186-2,873
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,670-4,357
Pettit5,673-5,360
Travis Peak6,045-5,732
Cotton Valley8,178-7,865

Perforations

Perforated and open-hole intervals.

FromToType
8,3608,400Perforated
8,9068,936Perforated
8,9509,010Perforated
8,9809,090Perforated
9,0509,090Perforated
9,0709,050Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,91514.751,300 S
4.59,3967.8752,320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 8, 1992Oct 7, 1992Yes
00Nov 2, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532635, documented in the API reference.