TEXAS · WELLS · PANOLA COUNTY · API 42-365-32678 · DISTRICT 06
Holmes Priestly Unit #8
Panola County · Carthage (Travis Peak-Smith S.) field · Temp Abandoned · Vertical
Holmes Priestly Unit #8 (API 42-365-32678) is a well in Panola County operated by Tgnr East Texas LLC, completed March 13, 1995 and listed as temp abandoned on the RRC schedule, shut in November 1, 2021.
The RRC has issued 2 drilling permits (amended once) between 1992 and 1993, permitted to 9,420 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.
Completion filings report 8 formation tops, including Paluxy, Palyxy, Paulxy, Anhydrite.
Its 3 leases have reported 15.7K barrels of oil and 2.37M mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 41
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas LLC |
| Production reports | TGNR East Texas LLCthrough Oct 2021 |
| Latest permit | Union Pacific Resources CompanyApr 19, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,420
- total depth, ft
- 3
- permits on file
- Apr 19, 1993
- last permit issued
- Mar 13, 1995
- completed
- 15.7K
- cumulative oil, bbl
- 2.37M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2021
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 13, 1995
- Shut in
- Nov 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holmes, Priestly Unit G-6-143476 | Carthage (Cotton Valley) | TGNR East Texas LLC | 1 | 13.8K | 1.5M | Jan 1993 – Oct 2021 |
| Holmes, Priestly Unit G-6-154466 | Carthage (Travis Peak-Smith, S.) | TGNR East Texas LLC | 1 | 1.29K | 828K | Mar 1995 – Oct 2010 |
| Holmes, Priestly Unit G-6-143628 | Carthage (Travis Peak-Allison) | Union Pacific Resources Company | 1 | 618 | 45.6K | Jan 1993 – Oct 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Dec 2012
- 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
- 5Cci East Texas Upstream LLCDec 2016 → Jan 2021
- 6TGNR East Texas LLCFeb 2021 → Oct 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410513-99 | Recompletion | Union Pacific Resources Company | Apr 5, 1993 | Apr 19, 1993 | Feb 22, 1995 | 9,950 |
| 401989-98 | Drill | Union Pacific Resources Company | Dec 31, 1992 | Aug 5, 1992 | — | 9,950 |
| 401989-99 | Drill | Union Pacific Resources Company | Aug 3, 1992 | Aug 5, 1992 | Sep 21, 1992 | 9,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 13, 1995 | Holmes Priestly Unit G-6-154466 | Carthage (Travis Peak-Smith S.) | TGNR East Texas LLC | Temp Abandoned · shut in Oct 1, 2010 | 9,420 |
| Nov 16, 1992 | Holmes Priestly Unit G-6-143476 | Carthage (Cotton Valley) | TGNR East Texas LLC | Temp Abandoned · shut in Nov 1, 2021 | 9,420 |
| Dec 12, 1992 | Holmes Priestly Unit G-6-143628 | Carthage (Travis Peak-Allison) | Union Pacific Resources Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 235 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 2,922 | -2,687 |
| Palyxy | 2,922 | -2,687 |
| Paulxy | 2,922 | -2,687 |
| Anhydrite | 4,705 | -4,470 |
| Pettit | 5,645 | -5,410 |
| Travis Peak | 6,072 | -5,837 |
| Cotton Valley | 8,190 | -7,955 |
| Bossier | 9,272 | -9,037 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,232 | 6,250 | Perforated |
| 6,300 | 6,308 | Perforated |
| 8,390 | 8,420 | Perforated |
| 8,990 | 9,020 | Perforated |
| 9,060 | 9,091 | Perforated |
| 9,252 | 9,270 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,920 | 14.75 | 1,250 S |
| 10.75 | 1,960 | 14.75 | 1,350 S |
| 2.875 | 6,889 | 7.875 | 1,730 S |
| 4.5 | 9,412 | 9.875 | 445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 9, 1995 | Jun 2, 1995 | Yes |
| 00 | Jul 5, 1995 | — | — |
| 00 | Feb 9, 1993 | Dec 31, 1992 | Yes |
| 00 | Jan 28, 1993 | — | — |
| 00 | Jan 19, 1993 | Dec 11, 1992 | Yes |
| 00 | Jan 12, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32678 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32678 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532678, documented in the API reference.