TEXAS · WELLS · PANOLA COUNTY · DONALD, F.H. LEASE · API 42-365-32771 · DISTRICT 06

Donald F.H. #6

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Donald F.H. #6 (API 42-365-32771) is a well in Panola County operated by Xto Energy Inc., completed May 19, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 14, 1992, permitted to 9,710 ft.

It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including James Lime, Pine Island, Pettit, Travis Peak.

Its lease has reported 13.7K barrels of oil and 2.97M mcf of gas since May 1993, last reporting volume in April 2026.

Operator of record

XTO Energy Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitExxon Corp.Dec 14, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,710
total depth, ft
1
permits on file
Dec 14, 1992
last permit issued
May 19, 1993
completed
13.7K
cumulative oil, bbl
2.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 19, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Donald, F.H. G-6-145699Carthage (Cotton Valley)XTO Energy Inc.113.7K2.97MMay 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 34,596 · prior 12 35,316(-2%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.May 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407172-99DrillExxon Corp.Dec 14, 1992Dec 14, 1992Dec 28, 19929,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 19, 1993Donald F.H. G-6-145699Carthage (Cotton Valley)XTO Energy Inc.Producing9,710

Formation tops

As filed on W-2/G-1. Subsea from 310 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,500-5,190
Pine Island5,647-5,337
Pettit5,772-5,462
Travis Peak6,247-5,937
Cotton Valley7,900-7,590

Perforations

Perforated and open-hole intervals.

FromToType
8,4008,413Perforated
8,7049,047Perforated
9,2049,294Perforated
9,6369,646Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,20517.5950 S
9.6255,28512.25690 S
5.59,7077.8751,330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 10, 1993Jun 11, 1993Yes
00Jul 7, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532771, documented in the API reference.