TEXAS · WELLS · PANOLA COUNTY · API 42-365-32800 · DISTRICT 06
Cgu 7 #6C
Panola County · Carthage (Cotton Valley) field · Producing · Vertical
Cgu 7 #6C (API 42-365-32800) is a well in Panola County operated by Tgnr East Texas LLC, completed May 12, 1993 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 1993 and 1997, permitted to 9,860 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.
Completion filings report 7 formation tops, including James Lime, Pettit, Travis Peak, Cotton Valley.
Its 3 leases have reported 1.87M mcf of gas since May 1993, last reporting volume in April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 41
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas LLC |
| Production reports | TGNR East Texas LLCthrough Apr 2026 |
| Latest permit | Union Pacific Resources CompanyApr 23, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,860
- total depth, ft
- 3
- permits on file
- Apr 23, 1997
- last permit issued
- May 12, 1993
- completed
- 0
- cumulative oil, bbl
- 1.87M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 12, 1993
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cgu 7 G-6-145611 | Carthage (Cotton Valley) | TGNR East Texas LLC | 1 | 0 | 1.86M | May 1993 – Apr 2026 |
| Cgu 7 G-6-166942 | Carthage (Chadwick 2) | TGNR East Texas LLC | 1 | 0 | 1 | Aug 1997 – Oct 1998 |
| Cgu 7 G-6-146800 | Carthage (Travis Peak-Allison) | Union Pacific Resources Company | 1 | 0 | 12.5K | Jun 1993 – Mar 1996 |
Gas, mcf lease total
Last 12 months 2,154 · prior 12 1,939(+11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyMay 1993 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Dec 2012
- 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
- 5Cci East Texas Upstream LLCDec 2016 → Jan 2021
- 6TGNR East Texas LLCFeb 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 461282-99 | Recompletion | Union Pacific Resources Company | Apr 17, 1997 | Apr 23, 1997 | Jun 11, 1997 | 9,860 |
| 409692-98 | Drill | Union Pacific Resources Company | Aug 12, 1993 | Mar 12, 1993 | — | 10,320 |
| 409692-99 | Drill | Union Pacific Resources Company | Mar 9, 1993 | Mar 12, 1993 | Mar 13, 1993 | 10,320 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 12, 1997 | Cgu 7 G-6-166942 | Carthage (Chadwick 2) | TGNR East Texas LLC | Temp Abandoned · shut in Oct 1, 2000 | 9,860 |
| May 12, 1993 | Cgu 7 G-6-145611 | Carthage (Cotton Valley) | TGNR East Texas LLC | Producing | 9,860 |
| Jun 9, 1993 | Cgu 7 G-6-146800 | Carthage (Travis Peak-Allison) | Union Pacific Resources Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 307 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 5,626 | -5,319 |
| James LimeJAMES LM. | 5,626 | -5,319 |
| Pettit | 5,878 | -5,571 |
| Travis Peak | 6,256 | -5,949 |
| Cotton Valley | 8,279 | -7,972 |
| Cotton Vly | 8,279 | -7,972 |
| Taylor | 9,660 | -9,353 |
| Bossier | 9,704 | -9,397 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,332 | 6,336 | Perforated |
| 7,720 | 7,730 | Perforated |
| 7,737 | 7,744 | Perforated |
| 7,758 | 7,763 | Perforated |
| 9,266 | 9,276 | Perforated |
| 9,281 | 9,285 | Perforated |
| 9,320 | 9,328 | Perforated |
| 9,330 | 9,330 | Perforated |
| 9,342 | 9,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,012 | 17.5 | 710 S |
| 10.75 | 5,400 | 12.25 | 1,080 S |
| 2.875 | 8,285 | — | 1,870 S |
| 4.5 | 9,859 | 9.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 2, 1998 | Jan 26, 1998 | Yes |
| 00 | Mar 12, 1998 | — | — |
| 00 | Nov 16, 1993 | Jul 1, 1993 | Yes |
| 00 | Oct 25, 1993 | — | — |
| 00 | Aug 5, 1993 | Jun 1, 1993 | Yes |
| 00 | Jun 30, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32800 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32800 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532800, documented in the API reference.