TEXAS · WELLS · PANOLA COUNTY · SEARCY GAS UNIT LEASE · API 42-365-32830 · DISTRICT 06

Searcy Gas Unit #5

Y

Panola County · Beckville (Cotton Valley) field · Producing  · Vertical

Searcy Gas Unit #5 (API 42-365-32830) is a well in Panola County operated by Tgnr East Texas LLC, completed October 1, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 15, 1993, permitted to 10,165 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Paluxy, Glen Rose, Anhydrite, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitUnion Pacific Resources CompanyJul 15, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,165
total depth, ft
1
permits on file
Jul 15, 1993
last permit issued
Oct 1, 1993
completed
0
cumulative oil, bbl
1.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 1, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Searcy Gas Unit G-6-147043Beckville, West (Cotton Valley)TGNR East Texas LLC101.64MOct 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 17,733 · prior 12 12,756(+39%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyOct 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  5. 5Cci East Texas Upstream LLCDec 2016 → Jan 2021
  6. 6TGNR East Texas LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413764-99DrillUnion Pacific Resources CompanyJul 12, 1993Jul 15, 1993Jul 20, 199310,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 1, 1993Searcy Gas Unit G-6-147043Beckville (Cotton Valley)TGNR East Texas LLCProducing10,165

Formation tops

As filed on W-2/G-1. Subsea from 305 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,496-3,191
Glen Rose3,785-3,480
Anhydrite5,210-4,905
Travis Peak6,530-6,225
Cotton Valley8,410-8,105
BossierBOSSIER SHALE9,825-9,520

Perforations

Perforated and open-hole intervals.

FromToType
9,4259,435Perforated
9,7349,744Perforated
9,7869,796Perforated
9,8059,815Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,00614.75950 S
4.510,1647.8751,455 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 9, 1993Oct 20, 1993Yes
00Nov 5, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532830, documented in the API reference.