TEXAS · WELLS · PANOLA COUNTY · API 42-365-32859 · DISTRICT 06
Jones Elsie Oil Unit No. 1 #7
Panola County · Carthage (Travis Peak) field · Producing · Vertical
Jones Elsie Oil Unit NO. 1 #7 (API 42-365-32859) is a well in Panola County operated by Xto Energy Inc., completed October 12, 1994 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 12, 1993, permitted to 9,700 ft.
It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including James Lime, Pine Island, Pettit, Transition Zone Tp.
Its 2 leases have reported 53.6K barrels of oil and 1.77M mcf of gas since July 1994, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | Exxon Corp.Oct 12, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,700
- total depth, ft
- 1
- permits on file
- Oct 12, 1993
- last permit issued
- Oct 12, 1994
- completed
- 53.6K
- cumulative oil, bbl
- 1.77M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 12, 1994
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones, Elsie G-6-151459 | Carthage (Cotton Valley) | XTO Energy Inc. | 1 | 0 | 1.24M | Jul 1994 – Jul 2026 |
| Jones, Elsie Oil Unit No. 1 O-6-13367 | Carthage (Travis Peak) | XTO Energy Inc. | 2 | 53.6K | 530K | Nov 1994 – Jul 2026 |
Gas, mcf lease total
Last 12 months 9,788 · prior 12 6,379(+53%)
Oil, barrels lease total
Last 12 months 97 · prior 12 75(+29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Aug 1994 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2013
- 3XTO Energy Inc.Jan 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416168-99 | Drill | Exxon Corp. | Sep 17, 1993 | Oct 12, 1993 | May 15, 1994 | 9,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 12, 1994 | Jones Elsie Oil Unit No. 1 O-6-13367 | Carthage (Travis Peak) | XTO Energy Inc. | Producing | 9,700 |
| Jul 24, 1994 | Jones Elsie G-6-151459 | Carthage (Cotton Valley) | XTO Energy Inc. | Producing | 9,700 |
| — | Jones Elsie Oil Unit No. 1 O-6-13367 | Carthage (Travis Peak) | XTO Energy Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 273 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 5,458 | -5,185 |
| Pine Island | 5,603 | -5,330 |
| Pettit | 5,720 | -5,447 |
| Transition Zone TP | 6,067 | -5,794 |
| Travis PeakTRAVIS PEAK TRANS | 6,067 | -5,794 |
| Travis Peak | 6,196 | -5,923 |
| Cotton Valley | 7,830 | -7,557 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,129 | 6,136 | Perforated |
| 6,148 | 6,152 | Perforated |
| 6,165 | 6,168 | Perforated |
| 6,174 | 6,179 | Perforated |
| 6,186 | 6,190 | Perforated |
| 8,348 | 8,372 | Perforated |
| 8,640 | 8,660 | Perforated |
| 8,787 | 9,022 | Perforated |
| 9,113 | 9,210 | Perforated |
| 9,504 | 9,543 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,226 | 17.5 | 1,025 S |
| 10.75 | 5,210 | 12.25 | 850 S |
| 2.875 | 6,594 | 9.875 | 1,094 S |
| 4.5 | 9,694 | 9.875 | 457 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 12, 1995 | Dec 28, 1994 | Yes |
| 00 | Mar 2, 1995 | — | — |
| 00 | Mar 1, 1995 | — | — |
| 00 | Nov 15, 1994 | Aug 24, 1994 | Yes |
| 00 | Oct 31, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32859 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32859 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532859, documented in the API reference.