TEXAS · WELLS · PANOLA COUNTY · SMITH, J. J. LEASE · API 42-365-32910 · DISTRICT 06

Smith J. J. #4

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Smith J. J. #4 (API 42-365-32910) is a well in Panola County operated by Eqv Operating LLC, completed March 24, 1994 and listed as temp abandoned on the RRC schedule, shut in April 1, 2015.

The RRC has issued one drilling permit, issued December 15, 1993, permitted to 9,570 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Eqv Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Glen Rose, James Lime, Cotton Valley.

Its lease has reported 9.63K barrels of oil and 826K mcf of gas since March 1994, with no volume in the three years through April 2026.

Operator of record

Eqv Operating LLC

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Sep 24, 2025
Phone
(405) 648-4409

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEqv Operating LLC
Production reportsEqv Operating LLCthrough Jul 2015
Latest permitEnron Oil & Gas CompanyDec 15, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,570
total depth, ft
1
permits on file
Dec 15, 1993
last permit issued
Mar 24, 1994
completed
9.63K
cumulative oil, bbl
826K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Jul 2015

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 24, 1994
Shut in
Apr 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, J. J. G-6-149744Carthage (Cotton Valley)Eqv Operating LLC19.63K826KMar 1994 – Jul 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyMar 1994 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Apr 2011
  3. 3Wildhorse Resources, LLCMay 2011 → Jun 2013
  4. 4Memorial Production Oper. LLCAug 2013 → Jul 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
419229-99DrillEnron Oil & Gas CompanyDec 10, 1993Dec 15, 1993Jan 14, 19949,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 24, 1994Smith J. J. G-6-149744Carthage (Cotton Valley)Eqv Operating LLCTemp Abandoned · shut in Apr 1, 20159,570

Formation tops

As filed on W-2/G-1. Subsea from 310 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose3,518-3,208
James Lime5,700-5,390
Cotton Valley8,356-8,046

Perforations

Perforated and open-hole intervals.

FromToType
9,0649,078Perforated
9,0889,160Perforated
9,1769,216Perforated
9,3449,380Perforated
9,3929,410Perforated
9,4329,458Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,60011610 S
4.59,5407.8751,115 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 6, 1994May 23, 1994Yes
00Jun 29, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36532910, documented in the API reference.