TEXAS · WELLS · PANOLA COUNTY · API 42-365-32938 · DISTRICT 06
Adams T.C. NCT-1 #44F
Panola County · Bethany (Pettit) field · Producing · Vertical
Adams T.C. Nct-1 #44F (API 42-365-32938) is a well in Panola County operated by Tgnr Panola LLC, completed March 7, 2003 and listed as producing on the RRC schedule.
The RRC has issued 3 drilling permits (amended twice) between 1994 and 2002, permitted to 9,500 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Base Mass A, Pettit, Travis Peak, Cotton Valley.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 27, 2026
- Permits on file
- 69
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco E & P Inc. |
| Production reports | TGNR Panola LLCthrough Apr 2026 |
| Latest permit | Chevron U. S. A. Inc.Jan 3, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 5
- permits on file
- Jan 3, 2002
- last permit issued
- Mar 7, 2003
- completed
- 0
- cumulative oil, bbl
- 3.21M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 7, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Adams, T.C. et UX NCT-1 G-6-151621 | Bethany, East (Cotton Valley) | TGNR Panola LLC | 1 | 0 | 2.4M | Aug 1994 – Jul 2026 |
| Adams, T.C. NCT-1 G-6-194011 | Bethany (Pettit) | TGNR Panola LLC | 1 | 0 | 564K | Mar 2003 – Jul 2026 |
| Adams, T. C NCT-1 G-6-184500 | Bethany (Travis Peak 6100) | Chevron U. S. A. Inc. | 1 | 0 | 10.2K | Aug 2001 – Mar 2003 |
| Adams, T.C. et UX NCT-1 G-6-152442 | Bethany (Travis Peak 6400, Gas) | Texaco E & P Inc. | 1 | 0 | 233K | Nov 1994 – Aug 2001 |
Gas, mcf lease total
Last 12 months 38,710 · prior 12 39,758(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Aug 1994 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
- 3TGNR Panola LLCApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 526094-99 | Recompletion | Chevron U. S. A. Inc. | Dec 5, 2002 | Jan 3, 2002 | Feb 24, 2003 | 5,900 |
| 510613-99 | Recompletion | Texaco E & P Inc. | Jun 22, 2001 | Jun 22, 2001 | Jun 28, 2001 | 7,820 |
| 421101-97 | Drill | Texaco E & P Inc. | Nov 14, 1994 | Apr 18, 1994 | — | 7,190 |
| 421101-98 | Drill | Texaco E & P Inc. | Aug 22, 1994 | Apr 18, 1994 | — | 10,000 |
| 421101-99 | Drill | Texaco E & P Inc. | Feb 14, 1994 | Apr 18, 1994 | Jul 10, 1994 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 7, 2003 | Adams T.C. NCT-1 G-6-194011 | Bethany (Pettit) | TGNR Panola LLC | Producing · shut in Feb 1, 2016 | 9,500 |
| Aug 25, 1994 | Adams T.C. et UX NCT-1 G-6-151621 | Bethany East (Cotton Valley) | TGNR Panola LLC | Producing | 9,500 |
| Jun 2, 2002 | Adams T. C NCT-1 G-6-184500 | Bethany (Travis Peak 6100) | Chevron U. S. A. Inc. | Not on Schedule | — |
| Nov 17, 1994 | Adams T.C. et UX NCT-1 G-6-152442 | Bethany (Travis Peak 6400 Gas) | Texaco E & P Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 280 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Mass A | 4,610 | -4,330 |
| Pettit | 5,410 | -5,130 |
| Travis Peak | 5,748 | -5,468 |
| Cotton Valley | 7,790 | -7,510 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,480 | 5,736 | Perforated |
| 6,100 | 6,115 | Perforated |
| 6,144 | 6,153 | Perforated |
| 6,174 | 6,181 | Perforated |
| 6,244 | 6,259 | Perforated |
| 6,527 | 6,533 | Perforated |
| 6,540 | 6,546 | Perforated |
| 8,245 | 9,240 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 70 | — | — |
| 10.75 | 2,865 | 14.75 | 2,170 S |
| 2.875 | 7,820 | 9.875 | 1,801 S |
| 2.875 | 7,820 | — | 1,801 S |
| 4.5 | 9,490 | 9.875 | 360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 2003 | Apr 11, 2003 | Yes |
| 00 | Apr 29, 2003 | — | — |
| 00 | Aug 6, 2002 | Jul 2, 2002 | — |
| 00 | Oct 9, 2001 | Sep 11, 2001 | Yes |
| 00 | Sep 26, 2001 | — | — |
| 00 | Mar 6, 1995 | Dec 1, 1994 | Yes |
| 00 | Jan 31, 1995 | — | — |
| 00 | Dec 13, 1994 | Sep 22, 1994 | Yes |
| 00 | Nov 9, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-32938 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-32938 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36532938, documented in the API reference.