TEXAS · WELLS · PANOLA COUNTY · API 42-365-33024 · DISTRICT 06

Chadwick OU 1 #6

Y

Panola County · Carthage (Travis Peak) field · Producing  · Vertical

Chadwick OU 1 #6 (API 42-365-33024) is a well in Panola County operated by Xto Energy Inc., completed January 11, 2017 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 2, 1994, permitted to 9,700 ft.

It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including James Lime, Pine Island, Pettit, Travis Peak.

Its 3 leases have reported 2.74K barrels of oil and 2.03M mcf of gas since October 1994, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitExxon Corp.Aug 2, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
2
permits on file
Aug 2, 1994
last permit issued
Jan 11, 2017
completed
2.74K
cumulative oil, bbl
2.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 11, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carthage GU 2 Ross G-6-152323Carthage (Cotton Valley)XTO Energy Inc.102.01MOct 1994 – Jul 2026
Chadwick OU 1 O-6-13410Carthage (Travis Peak)XTO Energy Inc.12.74K20.7KApr 1995 – Jul 2026
Carthage GU 2 G-6-152535Carthage (Travis Peak)Exxon Corp.100Nov 1994 – Mar 1995

Gas, mcf lease total

Last 12 months 20,891 · prior 12 21,481(-3%)

01K2K3K202420252026

Oil, barrels lease total

Last 12 months 87 · prior 12 337(-74%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Oct 1994 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
425684-98DrillExxon Corp.Sep 30, 1994Aug 2, 1994—9,700
425684-99DrillExxon Corp.Jul 8, 1994Aug 2, 1994Aug 10, 19949,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 11, 2017Chadwick OU 1 O-6-13410Carthage (Travis Peak)XTO Energy Inc.Producing9,700
Oct 15, 1994Carthage GU 2 Ross G-6-152323Carthage (Cotton Valley)XTO Energy Inc.Producing9,700
Nov 9, 1994Carthage GU 2 G-6-152535Carthage (Travis Peak)Exxon Corp.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 300 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,528-5,228
Pine Island5,664-5,364
Pettit5,775-5,475
Travis PeakTRAVIS PEAK TRANSITION6,130-5,830
Travis Peak6,256-5,956
Cotton Valley7,910-7,610

Perforations

Perforated and open-hole intervals.

FromToType
6,1746,268Perforated
6,3126,326Perforated
6,3426,352Perforated
8,3758,462Perforated
8,6228,735Perforated
9,1529,251Perforated
9,5449,574Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,20917.5900 S
10.755,28912.25850 S
2.8756,8789.6251,056 S
4.59,6857.875625 S
4.59,6859.625625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2018Feb 3, 2017—
00Jun 6, 1995May 3, 1995—
00May 25, 1995——
00Mar 14, 1995Dec 15, 1994Yes
00Mar 14, 1995Nov 17, 1994Yes
00Feb 2, 1995——
00Jan 25, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533024, documented in the API reference.