WELL · 42-365-33036 · DISTRICT 6

Brown J. C. OU 1 #7

N

Panola County · Carthage (Travis Peak) field  · Vertical

Brown J. C. OU 1 #7 (API 42-365-33036) is a permitted well in Panola County filed by Exxon Corp.; no completion report is on file yet.

The RRC has issued one drilling permit (amended once), issued August 22, 1994, permitted to 9,800 ft.

It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including James Lime, Pine Island, Pettit, Travis Peak.

Its 4 leases have reported 117K barrels of oil and 3.8M mcf of gas since December 1994, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitExxon Corp.Aug 22, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
2
permits on file
Aug 22, 1994
last permit issued
—
completed
117K
cumulative oil, bbl
3.8M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brown, J. C. G-6-153440Carthage (Cotton Valley)XTO Energy Inc.102.16MDec 1994 – Jul 2026
Brown, J. C. OU 1 G-6-300028Carthage (Travis Peak)XTO Energy Inc.1010.5KJul 2025 – Jul 2026
Brown, J. C. OU 1 O-6-13451Carthage (Travis Peak)XTO Energy Inc.1117K1.47MOct 1995 – Oct 2025
Brown, J. C. G-6-154079Carthage (Travis Peak)Exxon Corp.10159KJan 1995 – Oct 1995

Gas, mcf lease total

Last 12 months 37,560 · prior 12 42,563(-12%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Dec 1994 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427234-98DrillExxon Corp.Aug 26, 1994Aug 22, 1994Sep 11, 19949,800
427234-99DrillExxon Corp.Aug 22, 1994Aug 22, 1994—9,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-153440————
—— G-6-154079————
—— G-6-300028————
—— O-6-13451————

Formation tops

As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,541-5,221
Pine Island5,687-5,367
PettitPETTET5,794-5,474
Pettit5,794-5,474
Travis Peak6,169-5,849
Travis PeakTRAVIS PEAK-TRANSITION6,169-5,849
Travis PeakTRAVIS PEAK TRANSITION ZONE6,169-5,849
Travis Peak6,287-5,967
Cotton Valley7,999-7,679

Perforations

Perforated and open-hole intervals.

FromToType
6,1746,179Perforated
6,1746,228Perforated
6,1826,184Perforated
6,2016,207Perforated
6,2216,228Perforated
8,4708,869Perforated
8,9999,151Perforated
9,2679,354Perforated
9,5819,684Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,23017.5950 S
10.755,29012.25880 S
2.8756,6109.6251,102 S
4.59,7937.875786 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 30, 2025Aug 5, 2025Yes
00Jan 10, 1996Oct 11, 1995—
00Dec 5, 1995——
00Jul 19, 1995Mar 3, 1995Yes
00May 30, 1995——
00Apr 6, 1995Feb 9, 1995Yes
00Mar 31, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533036, documented in the API reference.