TEXAS · WELLS · PANOLA COUNTY · API 42-365-33097 · DISTRICT 06
Werner Sawmill #3
Panola County · Carthage (Travis Peak 6400) field · Vertical
Werner Sawmill #3 (API 42-365-33097) is a plugged well in Panola County, plugged December 16, 2025, last operated by Sheridan Production CO Iii LLC.
The RRC has issued 2 drilling permits between 1994 and 2005, permitted to 7,000 ft.
It was permitted by Devon Louisiana Corporation and has since transferred to Sheridan Production CO Iii LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Glen Rose, Tma, BMA, James Lime.
Operator of record
Sheridan Production Co III LLC
Permitted by Devon Louisiana Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 18, 2025
- Permits on file
- 97
- Phone
- (713) 548-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sheridan Production Co III LLC |
| Production reports | Sheridan Production Company, LLCthrough Aug 2016 |
| Latest permit | Devon Louisiana CorporationJul 27, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Jul 27, 2005
- last permit issued
- Sep 19, 2006
- completed
- 0
- cumulative oil, bbl
- 364K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jan 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 19, 2006
- Shut in
- —
- Plugged
- Dec 16, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Werner Sawmill G-6-216910 | Carthage (Travis Peak 6400) | Sheridan Production Co III, LLC | 1 | 0 | 52.8K | Oct 2005 – Jan 2026 |
| Werner Sawmill G-6-153810 | Gales (6500 Travis Peak) | Devon Louisiana Corporation | 1 | 0 | 312K | Jan 1995 – Oct 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seagull Mid-South, Inc.Mar 1995 → May 1998
- 2Seagull Energy E&P Inc.Jun 1998 → Oct 2000
- 3Ocean Energy, Inc.Nov 2000 → Aug 2003
- 4Devon Louisiana CorporationSep 2003 → Oct 2005
- 5Devon Energy Production Co, L.P.Oct 2005 → Jun 2016
- 6Sheridan Production Company, LLCJul 2016 → Aug 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 604041-99 | Recompletion | Devon Louisiana Corporation | Jul 27, 2005 | Jul 27, 2005 | — | 7,000 |
| 430593-99 | Drill | Seagull Mid-South, Inc. | Dec 2, 1994 | Dec 6, 1994 | Dec 17, 1994 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 19, 2006 | Werner Sawmill G-6-216910 | Carthage (Travis Peak 6400) | Sheridan Production Co III LLC | Plugged | — |
| Jan 23, 1995 | Werner Sawmill G-6-153810 | Gales (6500 Travis Peak) | Devon Energy Production Co L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 297 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 3,201 | -2,904 |
| Tma | 4,702 | -4,405 |
| BMA | 4,942 | -4,645 |
| James LimeJAMES | 5,453 | -5,156 |
| Sligo | 5,749 | -5,452 |
| Travis Peak | 6,102 | -5,805 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,368 | 6,388 | Perforated |
| 6,415 | 6,447 | Perforated |
| 6,602 | 6,618 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,000 | 12.25 | 280 S |
| 4.5 | 7,000 | 7.875 | 860 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 27, 2007 | May 29, 2007 | — |
| 00 | Oct 25, 2006 | Dec 20, 2005 | Yes |
| 00 | Jul 11, 2006 | — | — |
| 00 | May 10, 1995 | Mar 28, 1995 | Yes |
| 00 | May 4, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-33097 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-33097 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36533097, documented in the API reference.