TEXAS · WELLS · PANOLA COUNTY · SHARP-SMITH UNIT LEASE · API 42-365-33185 · DISTRICT 06

Sharp-Smith Unit #3

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Sharp-Smith Unit #3 (API 42-365-33185) is a well in Panola County operated by Tgnr Panola LLC, completed October 6, 1995 and listed as temp abandoned on the RRC schedule, shut in February 1, 2019.

The RRC has issued one drilling permit, issued June 15, 1995, permitted to 10,138 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Its lease has reported 1.26M mcf of gas since October 1995, with no volume in the three years through April 2026.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Jan 2019
Latest permitTexaco E & P Inc.Jun 15, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,138
total depth, ft
1
permits on file
Jun 15, 1995
last permit issued
Oct 6, 1995
completed
0
cumulative oil, bbl
1.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Jan 2019

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 6, 1995
Shut in
Feb 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sharp-Smith Unit G-6-156205Carthage (Cotton Valley)TGNR Panola LLC101.26MOct 1995 – Jan 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Oct 1995 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jan 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
436832-99DrillTexaco E & P Inc.Jun 14, 1995Jun 15, 1995Aug 16, 199510,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 6, 1995Sharp-Smith Unit G-6-156205Carthage (Cotton Valley)TGNR Panola LLCTemp Abandoned · shut in Feb 1, 201910,138

Formation tops

As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,610-5,340
Pettit6,338-6,068
Travis Peak6,653-6,383
Cotton Valley8,803-8,533

Perforations

Perforated and open-hole intervals.

FromToType
9,0559,250Perforated
9,4159,600Perforated
9,9089,953Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1675——
10.751,00014.75850 S
4.510,1387.8752,305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 9, 1996Oct 24, 1995Yes
00Dec 12, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533185, documented in the API reference.