TEXAS · WELLS · PANOLA COUNTY · API 42-365-33191 · DISTRICT 06
Coleman M.J. #7
Panola County · Carthage (Cotton Valley) field · Producing · Vertical
Coleman M.J. #7 (API 42-365-33191) is a well in Panola County operated by Xto Energy Inc., completed October 17, 1995 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 16, 1995, permitted to 9,400 ft.
It was permitted by Exxon Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including James Lime, Pine Island, Pettit, Travis Peak.
Its 2 leases have reported 16.1K barrels of oil and 1.95M mcf of gas since October 1995, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | Exxon Corp.Jun 16, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,400
- total depth, ft
- 1
- permits on file
- Jun 16, 1995
- last permit issued
- Oct 17, 1995
- completed
- 16.1K
- cumulative oil, bbl
- 1.95M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 17, 1995
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coleman, M.J. G-6-156290 | Carthage (Cotton Valley) | XTO Energy Inc. | 1 | 16.1K | 1.92M | Oct 1995 – Apr 2026 |
| Coleman, M.J. G-6-157178 | Carthage (Travis Peak) | XTO Energy Inc. | 1 | 3 | 23.6K | Dec 1995 – Jan 2002 |
Gas, mcf lease total
Last 12 months 27,117 · prior 12 29,341(-8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Oct 1995 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2013
- 3XTO Energy Inc.Jan 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 436976-99 | Drill | Exxon Corp. | Jun 16, 1995 | Jun 16, 1995 | Aug 21, 1995 | 9,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 5, 1995 | Coleman M.J. G-6-157178 | Carthage (Travis Peak) | XTO Energy Inc. | Temp Abandoned · shut in Jan 1, 2002 | 9,400 |
| Oct 17, 1995 | Coleman M.J. G-6-156290 | Carthage (Cotton Valley) | XTO Energy Inc. | Producing | 9,400 |
Formation tops
As filed on W-2/G-1. Subsea from 284 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 5,476 | -5,192 |
| Pine Island | 5,619 | -5,335 |
| Pettit | 5,727 | -5,443 |
| Travis Peak | 6,085 | -5,801 |
| Cotton Valley | 8,004 | -7,720 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,204 | 6,213 | Perforated |
| 8,383 | 8,394 | Perforated |
| 8,457 | 8,468 | Perforated |
| 8,673 | 8,680 | Perforated |
| 8,702 | 8,709 | Perforated |
| 8,868 | 8,878 | Perforated |
| 8,940 | 8,951 | Perforated |
| 9,008 | 9,018 | Perforated |
| 9,192 | 9,204 | Perforated |
| 9,242 | 9,255 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,250 | 17.5 | 990 S |
| 10.75 | 5,275 | 12.25 | 1,100 S |
| 2.875 | 6,533 | 9.875 | 840 S |
| 4.5 | 9,391 | 9.875 | 920 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 21, 1996 | Jan 11, 1996 | — |
| 00 | Mar 13, 1996 | — | — |
| 00 | Jan 9, 1996 | Dec 1, 1995 | Yes |
| 00 | Dec 14, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-33191 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-33191 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36533191, documented in the API reference.