WELL · 42-365-33304 · DISTRICT 6
Carthage GU 2 Ross #7
Panola County · Carthage (Travis Peak) field · Directional
Carthage GU 2 Ross #7 (API 42-365-33304) is a well in Panola County operated by Exxon Corp., completed May 17, 1996.
The RRC has issued one drilling permit, issued January 26, 1996, permitted to 9,700 ft.
Completion filings report 4 formation tops, including James Lime, Pine Island, Cotton Valley, Travis Peak.
Its 3 leases have reported 5.72K barrels of oil and 2.67M mcf of gas since January 1996, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | Exxon Corp.Jan 26, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,700
- total depth, ft
- 1
- permits on file
- Jan 26, 1996
- last permit issued
- May 17, 1996
- completed
- 5.72K
- cumulative oil, bbl
- 2.67M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 17, 1996
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carthage GU 2 Ross G-6-159952 | Carthage (Cotton Valley) | XTO Energy Inc. | 1 | 0 | 2.56M | Apr 1996 – Jul 2026 |
| Chadwick, J.M. (GU2) O-6-13626 | Carthage (Travis Peak) | XTO Energy Inc. | 1 | 5.72K | 96.3K | Jan 1996 – Jul 2026 |
| Carthage GU 2 Ross G-6-159956 | Carthage (Travis Peak) | Exxon Corp. | 1 | 0 | 15.8K | May 1996 – Jan 1997 |
Gas, mcf lease total
Last 12 months 4,464 · prior 12 4,176(+7%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Apr 1996 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2013
- 3XTO Energy Inc.Jan 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 443200-99 | Drill | Exxon Corp. | Dec 27, 1995 | Jan 26, 1996 | Feb 7, 1996 | 9,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-159952 | — | — | — | — |
| — | — G-6-159956 | — | — | — | — |
| — | — O-6-13626 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 280 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 5,746 | -5,466 |
| James LimeJAMES | 5,750 | -5,470 |
| Pine Island | 5,884 | -5,604 |
| Pine Island | 5,894 | -5,614 |
| Cotton Valley | 6,164 | -5,884 |
| Travis Peak | 6,352 | -6,072 |
| Travis Peak | 6,478 | -6,198 |
| Cotton Valley | 8,162 | -7,882 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,395 | 6,399 | Perforated |
| 6,451 | 6,457 | Perforated |
| 6,471 | 6,475 | Perforated |
| 8,640 | 8,650 | Perforated |
| 8,825 | 8,943 | Perforated |
| 9,162 | 9,177 | Perforated |
| 9,366 | 9,442 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 1,133 | 20 | 1,090 S |
| 10.75 | 5,501 | 14.75 | 1,850 S |
| 2.875 | 7,041 | 9.875 | 1,250 S |
| 4.5 | 9,616 | 9.875 | 615 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 1997 | Feb 5, 1997 | — |
| 00 | Mar 13, 1997 | — | — |
| 00 | Oct 14, 1996 | Jul 15, 1996 | Yes |
| 00 | Oct 14, 1996 | Jun 17, 1996 | Yes |
| 00 | Oct 3, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-33304 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-33304 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36533304, documented in the API reference.